2010
DOI: 10.1016/j.mcm.2010.04.024
|View full text |Cite
|
Sign up to set email alerts
|

An optimal common production cycle time for imperfect production processes with scrap

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
4
1

Citation Types

0
17
0

Year Published

2011
2011
2024
2024

Publication Types

Select...
8
1

Relationship

0
9

Authors

Journals

citations
Cited by 41 publications
(19 citation statements)
references
References 14 publications
0
17
0
Order By: Relevance
“…Among them a θ portion is scrap and the other (1 -θ) po (7) defective items is rtion of defective items is considered to be re-workable. Time needed for reworking is shown in Equation (8). During the reworking, a portion θ 1 of reworked items fail and becomes scrap.…”
Section: Formulation and Derivationmentioning
confidence: 99%
See 1 more Smart Citation
“…Among them a θ portion is scrap and the other (1 -θ) po (7) defective items is rtion of defective items is considered to be re-workable. Time needed for reworking is shown in Equation (8). During the reworking, a portion θ 1 of reworked items fail and becomes scrap.…”
Section: Formulation and Derivationmentioning
confidence: 99%
“…But in real-life production systems, due to process deterioration or other factors, generation of defective items is inevitable. Hence, many studies have been carried out to enhance EPQ model by addressing the imperfect quality production issue [5][6][7][8][9][10][11][12][13][14]. Rosenblatt and Lee [11] proposed an EPQ model that deals with imperfect quality.…”
Section: Introductionmentioning
confidence: 99%
“…Extra studies have been focused on issues of inevitable imperfect product quality and their consequent quality assurance matters (Henig & Gerchak, 1990;Rahim & BenDaya, 2001;Ma et al, 2010;Chiu et al, 2015;Karunambigai et al, 2015;Boorla & Howard, 2016;Gómez et al, 2016;Jawla & Singh, 2016).…”
Section: Introductionmentioning
confidence: 99%
“…Using the Euler-Lagrange method, the optimal solutions for product reliability parameter and dynamic production rate were obtained. Other papers that addressed various aspects of fabrication systems with defective items or quality improvement issues can also be found elsewhere [16][17][18][19][20][21][22][23][24][25][26][27][28].…”
Section: Introductionmentioning
confidence: 99%