2017 7th IEEE International Conference on Control System, Computing and Engineering (ICCSCE) 2017
DOI: 10.1109/iccsce.2017.8284434
|View full text |Cite
|
Sign up to set email alerts
|

An investigation on the power system stability of photovoltaic grid integrated system

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1
1
1

Citation Types

0
3
0

Year Published

2019
2019
2024
2024

Publication Types

Select...
3
3

Relationship

0
6

Authors

Journals

citations
Cited by 8 publications
(3 citation statements)
references
References 5 publications
0
3
0
Order By: Relevance
“…Figure 3 shows the difference in the fuel source for power generation. Moving forward the government is aiming to increase power generation from RE sources [11][12][13]. This can include solar power, wind, biomass, biogas, BESS systems and VPPs [14].…”
Section: Conventional Generationmentioning
confidence: 99%
“…Figure 3 shows the difference in the fuel source for power generation. Moving forward the government is aiming to increase power generation from RE sources [11][12][13]. This can include solar power, wind, biomass, biogas, BESS systems and VPPs [14].…”
Section: Conventional Generationmentioning
confidence: 99%
“…In this regard, these indicators may seem to be a proper tool for voltage stability assessment. Nevertheless, in the sequel, it will be shown that these indices have a major drawback, which is not considered in the literature . To explain this drawback, consider the simple network shown in Figure A, which includes three transmission lines connected in series.…”
Section: Improved Lsz Indicatorsmentioning
confidence: 99%
“…Nevertheless, in the sequel, it will be shown that these indices have a major drawback, which is not considered in the literature. 35,[48][49][50][51][52][53][54][55][56][57][58][59][60][61][62][63][64][65][68][69][70][71][72][73][74][75][76][77][78][79][80][81][82][83][84] To explain this drawback, consider the simple network shown in Figure 13A, which includes three transmission lines connected in series. In this network, the maximum transferable power is 67 as follows: When P max passes through the transmission corridor, it is expected that the line indices calculated for line 2 (or two other ones) reach to their critical threshold to show the proximity of the operating point to stability boundary.…”
Section: Figure 12mentioning
confidence: 99%