2011 Third International Conference on Measuring Technology and Mechatronics Automation 2011
DOI: 10.1109/icmtma.2011.111
|View full text |Cite
|
Sign up to set email alerts
|

An Intelligent Management System on Load Characteristic Identification and Power Supply Safety on Campus

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
2

Citation Types

0
2
0

Year Published

2014
2014
2014
2014

Publication Types

Select...
1

Relationship

0
1

Authors

Journals

citations
Cited by 1 publication
(2 citation statements)
references
References 4 publications
0
2
0
Order By: Relevance
“…Classical bread formulation, is stated as % follows; 55-60 % water (variable according to water lifting capacity of flour) 3-4 % fresh yeast (variable according to season and ambient temperature) 0,5-1 % bread ingredients (variable the rate of usage) 1.5-1,75 % salt (variable according to dry matter amounts and fresh dough) [6][7][8][9] With this model, bread and water amounts will be measured by operator demands; if 5 flow systems where kneading system is empty and broken, the flow will be supplied through the broken and empty system. This procedure of mixture and time are In this study; if in the flow line, only one kneading machine will work [10], the elapsed time is shown as graphic 1. When 5 line is active; in other words 5 kneading machine work [10], the elased time is shown in graphic 2.…”
Section: Resultsmentioning
confidence: 99%
See 1 more Smart Citation
“…Classical bread formulation, is stated as % follows; 55-60 % water (variable according to water lifting capacity of flour) 3-4 % fresh yeast (variable according to season and ambient temperature) 0,5-1 % bread ingredients (variable the rate of usage) 1.5-1,75 % salt (variable according to dry matter amounts and fresh dough) [6][7][8][9] With this model, bread and water amounts will be measured by operator demands; if 5 flow systems where kneading system is empty and broken, the flow will be supplied through the broken and empty system. This procedure of mixture and time are In this study; if in the flow line, only one kneading machine will work [10], the elapsed time is shown as graphic 1. When 5 line is active; in other words 5 kneading machine work [10], the elased time is shown in graphic 2.…”
Section: Resultsmentioning
confidence: 99%
“…This procedure of mixture and time are In this study; if in the flow line, only one kneading machine will work [10], the elapsed time is shown as graphic 1. When 5 line is active; in other words 5 kneading machine work [10], the elased time is shown in graphic 2. In this system, the most important mixture matter is flour.…”
Section: Resultsmentioning
confidence: 99%