2009
DOI: 10.1108/17410380910997263
|View full text |Cite
|
Sign up to set email alerts
|

An integrated dispatching rule with on‐line rework consideration in wafer fabrication

Abstract: Purpose -In wafer fabrication, the material cost of wafer is expensive. It is imperative to repair the defective wafers produced during the manufacturing process for reducing the cost and increasing the yield of wafer fabrication. However, repairing defective wafer will not only increase the work-in-process (WIP) level but the flow time of rework lots as well. In wafer fabrication, rework of wafer is only allowed in the photolithography area, where is the bottleneck of the entire wafer fab. The purpose of this… Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...

Citation Types

0
0
0

Publication Types

Select...

Relationship

0
0

Authors

Journals

citations
Cited by 0 publications
references
References 22 publications
0
0
0
Order By: Relevance

No citations

Set email alert for when this publication receives citations?