2024
DOI: 10.1038/s41598-023-48885-w
|View full text |Cite
|
Sign up to set email alerts
|

An integrated approach to occupational health risk assessment of manufacturing nanomaterials using Pythagorean Fuzzy AHP and Fuzzy Inference System

Samaneh Salari,
Mohsen Sadeghi-Yarandi,
Farideh Golbabaei

Abstract: Nanomaterials (NMs) have the potential to be hazardous owing to their unique physico-chemical properties. Therefore, the need for Health Risk Assessment (HRA) of NMs is expanding. In this study, a novel HRA was developed by the Pythagorean Fuzzy Health Risk Assessment (PFHRA) approach. Risk is considered to be the outcome of parameters including Occurrence Likelihood (OL), Potential Exposure (PE) and Toxic Effects (TE). In our proposed method, priority weights of sub-factors in Pythagorean Fuzzy-Analytical Hie… Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1
1

Citation Types

0
1
0

Year Published

2024
2024
2024
2024

Publication Types

Select...
4
1

Relationship

0
5

Authors

Journals

citations
Cited by 6 publications
(2 citation statements)
references
References 46 publications
(45 reference statements)
0
1
0
Order By: Relevance
“…The underground coal mine drainage program should consider the height of the water level in the water bin, the rate of change of the surge water and the period of the electricity price. Therefore, a three-input single-output fuzzy controller (three-dimensional fuzzy controller) is designed 31 , with the input variables of water level height E, gushing water change rate Ec and period Time. The output variable is the number of pumps turned on O.…”
Section: Research On Intelligent Control Strategy Of Mine Water Bin D...mentioning
confidence: 99%
“…The underground coal mine drainage program should consider the height of the water level in the water bin, the rate of change of the surge water and the period of the electricity price. Therefore, a three-input single-output fuzzy controller (three-dimensional fuzzy controller) is designed 31 , with the input variables of water level height E, gushing water change rate Ec and period Time. The output variable is the number of pumps turned on O.…”
Section: Research On Intelligent Control Strategy Of Mine Water Bin D...mentioning
confidence: 99%
“…According to the results, pollutants released from accidental spills had a higher risk compared to wastewater plant releases based on their concentrations. The approach is considered flexible and comprehensive for application in different scenarios [ 146 , 147 , 148 ]. Through computational models, pollutant concentrations in aquatic systems can be estimated [ 148 , 149 ] and continuously monitored.…”
Section: Limitations and Risks Of Using Endophytes And Nanoparticles ...mentioning
confidence: 99%