2016
DOI: 10.1016/j.jclepro.2015.08.096
|View full text |Cite
|
Sign up to set email alerts
|

An innovative approach to managing demolition waste via GIS (geographic information system): a case study in Shenzhen city, China

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
2
1
1
1

Citation Types

0
56
0
5

Year Published

2016
2016
2022
2022

Publication Types

Select...
7
3

Relationship

0
10

Authors

Journals

citations
Cited by 131 publications
(61 citation statements)
references
References 41 publications
0
56
0
5
Order By: Relevance
“…In their study on mining copper from the electric grid of Linköping, Sweden, Wallsten et al [82] demonstrate the potential of combining high spatial resolution with infrastructure material stock models. From a waste management perspective, the proposed model provides a much higher resolution compared to other GIS-based models that often focus on a regional or national level, such as Wu et al [83]. In the case of the building stock of the City of Melbourne, the significance of carpet in terms of embodied requirements offers great opportunities in terms of circular economy.…”
Section: Informing Future Environmental Decision Making In Citiesmentioning
confidence: 99%
“…In their study on mining copper from the electric grid of Linköping, Sweden, Wallsten et al [82] demonstrate the potential of combining high spatial resolution with infrastructure material stock models. From a waste management perspective, the proposed model provides a much higher resolution compared to other GIS-based models that often focus on a regional or national level, such as Wu et al [83]. In the case of the building stock of the City of Melbourne, the significance of carpet in terms of embodied requirements offers great opportunities in terms of circular economy.…”
Section: Informing Future Environmental Decision Making In Citiesmentioning
confidence: 99%
“…A construção civil é uma das atividades mais importantes para o desenvolvimento econômico e social (PINTO et al, 2005;BARRA, et al, 2006;OLIVEIRA, 2012). Todavia, por outro lado, também é responsável por promover diversos impactos ambientais em função do elevado consumo de recursos naturais, modificação da paisagem e pela grande quantidade de resíduos gerados (PINTO et al, 2005;MARTINS, 2012;WU et al, 2015).…”
Section: Gestão De Resíduos De Construção E Demolição (Rcd)unclassified
“…Segundo Wu et al (2016), isto resultou da rápida urbanização (19% em 1980 para 54% em 2013 Moraes (2006), que ressaltou ainda a ocupação de áreas extensas e rápido esgotamento da capacidade dos aterros.…”
Section: Fundamentação Teóricaunclassified