Day 1 Mon, November 15, 2021 2021
DOI: 10.2118/207770-ms
|View full text |Cite
|
Sign up to set email alerts
|

An Innovative Approach to Install Production String with ESP to Avoid Productivity Impairment in Multistage Fractured Horizontal Well

Abstract: Objectives/Scope Generally, tight reservoirs require hydraulic fracturing to enhance and sustain hydrocarbon production. However, fracturing requires frac string with bigger Internal Diameter (ID) to minimize frictional losses during hydraulic fracturing operation. This string ID may not be suitable to provide optimum Vertical Lift Performance (VLP) during production phase, particularly in oil wells. Therefore, it is required to replace the frac string with production string of smaller ID. Oc… Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...

Citation Types

0
0
0

Publication Types

Select...

Relationship

0
0

Authors

Journals

citations
Cited by 0 publications
references
References 2 publications
0
0
0
Order By: Relevance

No citations

Set email alert for when this publication receives citations?