Day 1 Tue, September 14, 2021 2021
DOI: 10.2118/206387-ms
|View full text |Cite
|
Sign up to set email alerts
|

An Industry First - A Successful Managed Pressure Horizontal Open Hole Gravel Pack Project: Its Preparation, Integration, Modeling, Procedures, and Execution Results

Abstract: This paper presents how a Controlled Mud Level (CML) Managed Pressure Drilling (MPD) system was used to place Horizontal Open Hole Gravel Packs (HzOHGP) in low Pore Pressure Frac Gradient (PPFG) margin reservoirs. This industry-first accomplishment took extensive preparation and precise on-site coordination between CML and gravel pack operations. In the target reservoirs, the margin between the pore and fracture pressures is too small to place gravel packs using conventional methods. CML was identified as an o… Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...

Citation Types

0
0
0

Year Published

2021
2021
2024
2024

Publication Types

Select...
2

Relationship

0
2

Authors

Journals

citations
Cited by 2 publications
references
References 4 publications
0
0
0
Order By: Relevance