2014
DOI: 10.1016/j.cie.2013.08.026
|View full text |Cite
|
Sign up to set email alerts
|

An improved heuristic to minimize total flow time for scheduling in the m-machine no-wait flow shop

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
4
1

Citation Types

0
6
0
1

Year Published

2014
2014
2020
2020

Publication Types

Select...
9

Relationship

0
9

Authors

Journals

citations
Cited by 26 publications
(7 citation statements)
references
References 27 publications
0
6
0
1
Order By: Relevance
“…Problemi en büyük tamamlanma zamanı ve toplam akış zamanı olmak üzere çok amaçlı ele almıştır. Laha ve Sapkal [30] toplam akış zamanını en küçükleme amaçlı sezgisel bir algoritma, Tseng ve Lin [31] en büyük tamamlanma zamanını en küçükleme amaçlı çözüm için yerel arama ve genetik algoritmadan elde edilmiş hibrit bir algoritma, Chaundry ve Mahmood [32] genetik algoritma sunmuşlardır. Czogalla ve Fink [33] aynı problemin gecikme süresini en küçükleme amaçlı çözümü için yerel arama ve parçacık sürü optimizasyonu algoritmalarını birleştirdikleri hibrit bir algoritma sunmuşlardır.…”
Section: Literatür Taramasıunclassified
“…Problemi en büyük tamamlanma zamanı ve toplam akış zamanı olmak üzere çok amaçlı ele almıştır. Laha ve Sapkal [30] toplam akış zamanını en küçükleme amaçlı sezgisel bir algoritma, Tseng ve Lin [31] en büyük tamamlanma zamanını en küçükleme amaçlı çözüm için yerel arama ve genetik algoritmadan elde edilmiş hibrit bir algoritma, Chaundry ve Mahmood [32] genetik algoritma sunmuşlardır. Czogalla ve Fink [33] aynı problemin gecikme süresini en küçükleme amaçlı çözümü için yerel arama ve parçacık sürü optimizasyonu algoritmalarını birleştirdikleri hibrit bir algoritma sunmuşlardır.…”
Section: Literatür Taramasıunclassified
“…The problem with no-wait constraint in flow shop scheduling with minimization of total flow time as criterion has been studied by Van Deman and Baker (1974), Rajendran and Chaudhuri (1990), Chen et al (1996), Allahverdi (1998, 2004), Allahverdi and Aldowaisan (2000), Bertolissi (2000), Gao et al (2013), Akhshabi et al (2014) and Laha and Sapkal (2014). The problem of scheduling of jobs with the objective as makespan with no-wait constraint in flow shop has been studied by many researchers.…”
Section: Introductionmentioning
confidence: 99%
“…For some of them the processing of a job cannot be interrupted once started. Some examples of such production systems are chemical, metal, food processing industries and printed circuit board manufacturing (Adiri and Pohoryles, 1982;Hall and Sriskandarajah, 1996;Nagano et al, 2012;Laha and Sapkal, 2014;Nagano et al, 2015). In addition, modern manufacturing environments where robots and industrial machines provide a highly coordinated process, can frequently be modeled as a no-wait scheduling problem (Bertolossi, 2000).…”
Section: Introductionmentioning
confidence: 99%
“…Recently, Allahverdi (2016) published a comprehensive survey of the no-wait in process scheduling problems. The no-wait flow shop scheduling problems with more than two machines belong to the class of NP-hard (Papadimitriou and Kanelakis, 1980;Rock, 1984;Van Der Veen et al, 1991;Fink and Voβ, 2003;Laha and Sapkal, 2014). Because of exponential computational effort requirements, heuristic methods have been proposed for the problem with m-machines in order to provide nearoptimal solution in small computational effort (Laha et al, 2013).…”
Section: Introductionmentioning
confidence: 99%