Proceedings of the 2007 InSITE Conference 2007
DOI: 10.28945/3158
|View full text |Cite
|
Sign up to set email alerts
|

An Evolutionary Software Project Management Maturity Model for Mauritius

Abstract: Software project management is a relatively recent discipline that emerged during the second half of the 20 th century (Kwak, 2003). Many of the software project management methodologies available today were developed in Western/European countries and research showed that there was a need to formalise a software project management framework for developing countries, in particular Africa (Muriithi & Crawford, 2003).Based on surveys and discussions with software professionals, a methodology for software project … Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1
1
1
1

Citation Types

0
7
0

Year Published

2011
2011
2022
2022

Publication Types

Select...
4
1

Relationship

0
5

Authors

Journals

citations
Cited by 5 publications
(7 citation statements)
references
References 2 publications
0
7
0
Order By: Relevance
“…Analytical skill is related to decision making based on the assembling and analyzing facts. This skill is much desired when a project is running short of time (Callaghan, 2013;Kathleen, 2009;Sukhoo, 2009). Analytical skill is viewed as much desired graduate student skills (McCorkle et al, 1999).…”
Section: Collaborative Problem Solving Skillsmentioning
confidence: 99%
“…Analytical skill is related to decision making based on the assembling and analyzing facts. This skill is much desired when a project is running short of time (Callaghan, 2013;Kathleen, 2009;Sukhoo, 2009). Analytical skill is viewed as much desired graduate student skills (McCorkle et al, 1999).…”
Section: Collaborative Problem Solving Skillsmentioning
confidence: 99%
“…Theses assessment methodologies provide overview and helpful information on the state of project management practices within the country. Examples of these countries are South Africa [12], Switzerland [13], Mauritius [11] [9], Ethiopia [15], Portugal [20], Kazakhstan [2] etc. A similar survey was carried out in Egypt and included in the Expert Judgement survey to determine the maturity level of the Egyptian construction contractors.…”
Section: Assessment Of Project Management Maturity For Contracting Ormentioning
confidence: 99%
“…According to several previous studies and authors such as Kerzner [21], Sukhoo [11], Kwak and Ibbs [27], Schlitz [13], Soninke"s and Launching [12], Archibald and Paradox [3] and several others have shown a direct relation between the project management maturity and project success. We conclude by noting the current survey the need for a maturity framework that can bridge the existing gap in construction project management between Egypt and developed countries to achieve the government vision of developing the contracting sector as one of the pillars for the national economy.…”
Section: Conclusion the Way Forward And Further Stepsmentioning
confidence: 99%
See 1 more Smart Citation
“…The capability maturity model (CMM) concept originates from a quality management maturity grid proposed by Phil Crosby ( 1979 ), subsequently developed for numerous functions, such as software engineering, integrated product development, systems engineering and more. The CMMI Institute (cmmiinstitute.com) integrated these models, but they are extremely complex and inappropriate for SME suppliers (Sukhoo et al 2007 ). Development of a simpler and more practical LCM CMM is described under Methods.…”
Section: Chapter Outlinementioning
confidence: 99%