2012 Third International Conference on Computer and Communication Technology 2012
DOI: 10.1109/iccct.2012.53
|View full text |Cite
|
Sign up to set email alerts
|

An Enhanced Handover Strategy for GSM-R Technology

Abstract: Global System for Mobile Communications for Railway (GSM-R) technology plays an important role on high speed railway communication; but the handover technique demands betterment in high speed railways. This paper enhances the handover algorithm for GSM-R technology by applying a newly proposed Dynamic Handover Margin Evaluation(DHME) technique that provides ping-pong effect free dynamic handover margin according to the vehicle speed, establishing a new Group handover algorithm which is inspired by Bully's Algo… Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1
1

Citation Types

0
2
0

Year Published

2014
2014
2018
2018

Publication Types

Select...
4
1
1

Relationship

0
6

Authors

Journals

citations
Cited by 8 publications
(2 citation statements)
references
References 13 publications
(15 reference statements)
0
2
0
Order By: Relevance
“…On this basis, the authors proposed a handover trigger scheme where the handover position was determined by statistical data in [16]. In [17], the authors proposed a joint handover trigger scheme based on RSRP and speed, this scheme used a fast handover scheme to improve the handover success probability when the speed exceeded a threshold. In [18], the handover trigger scheme based on probability of satisfied communication (PoSC) model was proposed, this scheme can reduce the handover numbers and maintain high QoS by considering the effect of received signal strength, co‐channel interference and speed on BER.…”
Section: Introductionmentioning
confidence: 99%
“…On this basis, the authors proposed a handover trigger scheme where the handover position was determined by statistical data in [16]. In [17], the authors proposed a joint handover trigger scheme based on RSRP and speed, this scheme used a fast handover scheme to improve the handover success probability when the speed exceeded a threshold. In [18], the handover trigger scheme based on probability of satisfied communication (PoSC) model was proposed, this scheme can reduce the handover numbers and maintain high QoS by considering the effect of received signal strength, co‐channel interference and speed on BER.…”
Section: Introductionmentioning
confidence: 99%
“…The hooter will be louder as the level crossing nears, and finally it will be silent after the train passes by. There are several other methods proposed for automatically controlled railway gate at the level crossing, railway track switching mechanism and the movement of the train using sensors, micro controllers for reduction of railway accidents but all demand heavy investment [8][9][10][11][12][13][14][15][16][17][18][19][20].…”
Section: Fig4 a Typical Layout Of Level Crossingmentioning
confidence: 99%