2019
DOI: 10.1007/978-981-15-2184-3_38
|View full text |Cite
|
Sign up to set email alerts
|

An empirical analysis on measured ground surface settlement induced by TBM tunnelling in Ho Chi Minh city

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1
1

Citation Types

0
1
0

Year Published

2021
2021
2023
2023

Publication Types

Select...
1
1

Relationship

0
2

Authors

Journals

citations
Cited by 2 publications
(3 citation statements)
references
References 4 publications
0
1
0
Order By: Relevance
“…The monitoring points, measured by precise levelling techniques, were arranged approximately perpendicular to the tunnel centre-line (Le et al, 2020). At each section, there were five to eight monitoring points.…”
Section: The Monitoring Schemementioning
confidence: 99%
See 1 more Smart Citation
“…The monitoring points, measured by precise levelling techniques, were arranged approximately perpendicular to the tunnel centre-line (Le et al, 2020). At each section, there were five to eight monitoring points.…”
Section: The Monitoring Schemementioning
confidence: 99%
“…The TBM was then dismantled and transported back to Bason station for West Bound (WB) tunnel excavation. The WB tunnel was constructed from 26 th January 2018 to 29 th June 2018(Le et al, 2020). Figure7a, b present the advance rate of the TBM in EB and WB tunnels, respectively.…”
mentioning
confidence: 99%
“…They deliver the genes to targeted cells (Ura, Okuda and Shimada, 2014). They induce cellular and humoral immunity and have greater potential to stimulate cytotoxic T-Cells, which eliminate virus-infected cells (Le, Kuriki, Phan and Taylor, 2019). Among them is, Ad5-nCov developed by CanSino biologics, Beijing Institute of Biotechnology.…”
Section: Viral Vectored Vaccinementioning
confidence: 99%