“…The PV model SPVG is connected to the load buses (3,5,7,9,10,11,12,13,15,16,17,18,19,20,21,22,23,24) on a perbus basis. It monitors the ratio of total active power losses to total active power generation and designates the location with the smallest value of losses as the optimal one.…”