2013
DOI: 10.1016/j.cie.2013.07.009
|View full text |Cite
|
Sign up to set email alerts
|

An efficient approach to determine cell formation, cell layout and intracellular machine sequence in cellular manufacturing systems

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
2
1
1
1

Citation Types

2
37
0
1

Year Published

2014
2014
2023
2023

Publication Types

Select...
8

Relationship

0
8

Authors

Journals

citations
Cited by 66 publications
(40 citation statements)
references
References 32 publications
2
37
0
1
Order By: Relevance
“…O quadro 7 apresenta a lista completa de referências que abordam os parâmetros citados. Os tempos padrões definidos a priori são observados na prática nos processos que constituem a célula (PEINADO;GRAEML, 2007) O layout projetado para a célula demonstrase adequado para diferentes ciclos produtivos desenvolvidos pelos colaboradores (AALAEI;DAVOUDPOUR, 2016;ARORA;HALEEM;SINGH, 2013;CHANG;WU;WU, 2013;DEEP;SINGH, 2015;BLACK, 2007;METTERNICH;BECHTLOFF;SEIFERMANN, 2013;MOYANO-FUENTES;SACRISTÁN-DÍAZ, 2012;PAPAIOANNOU;WILSON, 2010;RAFIEE et al, 2011;RAMINFAR et al, 2013;RIBEIRO, 2011;TANIMIZU;ISHII;YOKOTANI, 2014) Os processos mais críticos da célula (operações restritivas) são conhecidos e constantemente gerenciados (BROWN, 2015;ERENAY et al, 2015;PEINADO;GRAEML, 2007) Quadro 7 -Parâmetros para o grupo "Configuração da célula" (conclusão)…”
Section: Parâmetros Referênciasunclassified
“…O quadro 7 apresenta a lista completa de referências que abordam os parâmetros citados. Os tempos padrões definidos a priori são observados na prática nos processos que constituem a célula (PEINADO;GRAEML, 2007) O layout projetado para a célula demonstrase adequado para diferentes ciclos produtivos desenvolvidos pelos colaboradores (AALAEI;DAVOUDPOUR, 2016;ARORA;HALEEM;SINGH, 2013;CHANG;WU;WU, 2013;DEEP;SINGH, 2015;BLACK, 2007;METTERNICH;BECHTLOFF;SEIFERMANN, 2013;MOYANO-FUENTES;SACRISTÁN-DÍAZ, 2012;PAPAIOANNOU;WILSON, 2010;RAFIEE et al, 2011;RAMINFAR et al, 2013;RIBEIRO, 2011;TANIMIZU;ISHII;YOKOTANI, 2014) Os processos mais críticos da célula (operações restritivas) são conhecidos e constantemente gerenciados (BROWN, 2015;ERENAY et al, 2015;PEINADO;GRAEML, 2007) Quadro 7 -Parâmetros para o grupo "Configuração da célula" (conclusão)…”
Section: Parâmetros Referênciasunclassified
“…(Villaseñor y Galindo, 2007); (Salazar, Vargas, Añasco y Orejuela, 2010); (Cardona, 2013); (Chang, Wu y Wu, 2013)only few articles have focused on more practical and complicated problems that simultaneously consider the three critical issues in the CMS-design process, i.e., cell formation, cell layout, and intracellular machine sequence. In this study, a two-stage mathematical programming model is formulated to integrate the three critical issues with the consideration of alternative process routings, operation sequences, and production volume.…”
Section: Herramientamentioning
confidence: 99%
“…They surveyed dynamic and robust layouts, various solution methods especially intelligent approaches along with their advantages and disadvantages. Chang et al [19] formulated a two-stage mathematical programming model to integrate the three critical issues in the CMS-design process, i.e., cell formation, cell layout, and intracellular machine sequence with the consideration of alternative process routings, operation sequences, and production volume. They proposed an efficient tabu search algorithm based on a generalized similarity coefficient to solve the model.…”
Section: Design Of Cellular Manufacturing Systemsmentioning
confidence: 99%