2010
DOI: 10.1016/j.petrol.2009.11.003
|View full text |Cite
|
Sign up to set email alerts
|

An automation system for gas-lifted oil wells: Model identification, control, and optimization

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
3
1
1

Citation Types

0
20
0
1

Year Published

2012
2012
2021
2021

Publication Types

Select...
7
1

Relationship

1
7

Authors

Journals

citations
Cited by 37 publications
(23 citation statements)
references
References 28 publications
0
20
0
1
Order By: Relevance
“…However, the pressure drop due to fl uid level drop would be domininat over the pressure drop due to friction when the tubing size is more than the optimum tubing size. This would result in production rate to decrease (Camponogara et al, 2010;Mahmudi and Sadeghi, 2013;Allyeva and Novruzaliyev, 2015;Elldakli and Soliman, 2017). Therfore, there always must be an optimum value for the tubing size as it was shown in Figures 4-6 in this study.…”
Section: Discussionmentioning
confidence: 66%
“…However, the pressure drop due to fl uid level drop would be domininat over the pressure drop due to friction when the tubing size is more than the optimum tubing size. This would result in production rate to decrease (Camponogara et al, 2010;Mahmudi and Sadeghi, 2013;Allyeva and Novruzaliyev, 2015;Elldakli and Soliman, 2017). Therfore, there always must be an optimum value for the tubing size as it was shown in Figures 4-6 in this study.…”
Section: Discussionmentioning
confidence: 66%
“…Well head flowing pressure is registered using a pressure recorder installed at the wellhead. The oil rate, the GLR, the water cut, the API gravity, and the oil formation volume factor have been determined using a track or skid mounted Portable Test (Oglesby et al 2006;Camponogara et al 2010).…”
Section: Data Descriptionmentioning
confidence: 99%
“…Aiming at the deficiencies when a single well is as the research object, the overall optimization model of the oil and gas production block is established by Dong et al, and it is superior to the single well optimization strategy. For a lift‐gas well, studies had addressed the optimization problem of oil field production process with rate capacity constraints . These studies did not consider pressure and temperature constraints.…”
Section: Introductionmentioning
confidence: 99%