Abstract: Summary In order to discover anomalies of dam structure behaviors and evaluate the operation status timely, it is quite demanding to analyze the dam safety monitoring data that has been collected from the instruments. However, outliers in original monitoring data may affect the accuracy of dam performance assessment, which need to be detected before analyzing monitoring data. Model‐based methods have been applied in outlier detection as a kind of common method for a long time, but they generally rely heavily o… Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
2
2
1

Citation Types

0
5
0

Year Published

2022
2022
2024
2024

Publication Types

Select...
6
1
1

Relationship

1
7

Authors

Journals

citations
Cited by 18 publications
(10 citation statements)
references
References 30 publications
0
5
0
Order By: Relevance
“…Instrument monitoring index system. Combining the risk characteristics of this project and related literature [24][25][26] , this paper selects surface settlement (F1), groundwater level (F2), horizontal displacement of wall top (F3) and vertical displacement of column (F4) as the risk assessment indexes of this pit, which are jointly controlled by cumulative values and change rates, as shown in Table 3. Considering that the risk assessment results and the actual monitoring value (the ratio K between the measured value and the early warning value) have the same trend, this paper takes the early warning value as the benchmark and converts each indicator into a dimensionless quantity through the value of K in order to realize the unification of risk indicators.…”
Section: Results and Analysismentioning
confidence: 99%
“…Instrument monitoring index system. Combining the risk characteristics of this project and related literature [24][25][26] , this paper selects surface settlement (F1), groundwater level (F2), horizontal displacement of wall top (F3) and vertical displacement of column (F4) as the risk assessment indexes of this pit, which are jointly controlled by cumulative values and change rates, as shown in Table 3. Considering that the risk assessment results and the actual monitoring value (the ratio K between the measured value and the early warning value) have the same trend, this paper takes the early warning value as the benchmark and converts each indicator into a dimensionless quantity through the value of K in order to realize the unification of risk indicators.…”
Section: Results and Analysismentioning
confidence: 99%
“…The maximum number of iterations of the PSO algorithm was set to 200, the total number of particles was set to 30, and the fitness function was set to be the OOB error of RF. Before optimization, the ranges of parameters n and m were set as [100, 1000] and [1,12], respectively.…”
Section: Particle Swarm Optimization Algorithmmentioning
confidence: 99%
“…The relevant parameters of the SCSO algorithm were set as follows: the maximum number of iterations was 200, the number of sand cats was 30, and the maximum sensitivity range was 2. Similarly, the ranges of parameters n and m were set as [100, 1000] and [1,12], respectively, and the fitness function was the OOB error of RF. The specific iterative process of SCSO-RF is shown in Figure 12.…”
Section: Sand Cat Swarm Optimization Algorithmmentioning
confidence: 99%
See 1 more Smart Citation
“…Meanwhile, the service performances of arch dams have a significant impact on people's lives and property [1][2][3]. Deformation can intuitively reflect the arch dam performance, and continuous deformation monitoring data in space can help to analyze and forecast the operational status of arch dam structure safety in real time [4,5]. Nevertheless, the number of dam monitoring points is limited, which is caused by some financial, logistical, and geological factors [6].…”
Section: Introductionmentioning
confidence: 99%