2014
DOI: 10.1080/0740817x.2014.917778
|View full text |Cite
|
Sign up to set email alerts
|

An assignment-sequencing methodology for scheduling assembly and test operations with multi-pass requirements

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
2
1

Citation Types

0
3
0

Year Published

2017
2017
2024
2024

Publication Types

Select...
7

Relationship

0
7

Authors

Journals

citations
Cited by 10 publications
(3 citation statements)
references
References 22 publications
0
3
0
Order By: Relevance
“…The HF c |recrc, aux, s lk |Lex(device shortage, throughput, machine utilization, C max ) is studied in [135,136]. Bard et al [135] proposed a three-phase approach based on the GRASP that tackles multi-pass and machine changeovers separately, while Gao et al [136] developed a decomposition method that tackles machine setups, job sequencing, and machine resets sequentially. Experiments on real instances showed [136] generate better solutions than [135].…”
Section: Hybrid (Flexible) Flow Shopsmentioning
confidence: 99%
See 1 more Smart Citation
“…The HF c |recrc, aux, s lk |Lex(device shortage, throughput, machine utilization, C max ) is studied in [135,136]. Bard et al [135] proposed a three-phase approach based on the GRASP that tackles multi-pass and machine changeovers separately, while Gao et al [136] developed a decomposition method that tackles machine setups, job sequencing, and machine resets sequentially. Experiments on real instances showed [136] generate better solutions than [135].…”
Section: Hybrid (Flexible) Flow Shopsmentioning
confidence: 99%
“…Bard et al [135] proposed a three-phase approach based on the GRASP that tackles multi-pass and machine changeovers separately, while Gao et al [136] developed a decomposition method that tackles machine setups, job sequencing, and machine resets sequentially. Experiments on real instances showed [136] generate better solutions than [135]. Lin et al studied reentrant hybrid flow shop scheduling problems considering limited inventory buffers on each workstation and a central stocker [137].…”
Section: Hybrid (Flexible) Flow Shopsmentioning
confidence: 99%
“…Gao et al [39] present a three-phase methodology for a scheduling assembly and final test operations for semiconductor devices. In the first phase, the authors solve the assignment of tooling and lots to machines, and in the second phase, the lots are optimally sequenced.…”
Section: Literature Reviewmentioning
confidence: 99%