2020
DOI: 10.1177/0954405420904848
|View full text |Cite
|
Sign up to set email alerts
|

An assembling algorithm for fixture in an assembly process planning system

Abstract: Three-dimensional assembly process planning is a precondition for achieving full product lifecycle management based on three-dimensional modelling. Information expression and management operations of fixture models are key to three-dimensional assembly process planning systems. To reasonably and efficiently achieve the goal of planning assembly processes with a fixture model, the application of a fixture information model to a three-dimensional assembly process planning system is investigated. First, to manage… Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
4

Citation Types

0
4
0

Year Published

2020
2020
2024
2024

Publication Types

Select...
5

Relationship

0
5

Authors

Journals

citations
Cited by 5 publications
(4 citation statements)
references
References 25 publications
(24 reference statements)
0
4
0
Order By: Relevance
“…4 Assembly Sequence Planning (ASP), piecing individual parts together in succession, is the vital stage of the production cycle because it comprises 40%-70% of the overall manufacturing cost and time. [5][6][7] ASP is an NP-hard problem that can generate ''n!'' feasible linear assembly sequences from a product with ''n'' number of parts.…”
Section: Introductionmentioning
confidence: 99%
See 1 more Smart Citation
“…4 Assembly Sequence Planning (ASP), piecing individual parts together in succession, is the vital stage of the production cycle because it comprises 40%-70% of the overall manufacturing cost and time. [5][6][7] ASP is an NP-hard problem that can generate ''n!'' feasible linear assembly sequences from a product with ''n'' number of parts.…”
Section: Introductionmentioning
confidence: 99%
“…4 Assembly Sequence Planning (ASP), piecing individual parts together in succession, is the vital stage of the production cycle because it comprises 40%–70% of the overall manufacturing cost and time. 57…”
Section: Introductionmentioning
confidence: 99%
“…These methods are mainly classified into two categories: numerical programming method and heuristic method. All the numerical programming methods 1316 start with an initial feasible layout and then optimize the scheme until the scheme cannot be further improved. The solutions obtained by these methods are very susceptible to the initial layout and usually cannot obtain the global optimal solution.…”
Section: Introductionmentioning
confidence: 99%
“…The intelligent optimization of the model uses the intelligent algorithm to solve the scheduling mathematical model. [8][9][10] Wen et al 11 embedded the trained neural network into the genetic algorithm to optimize remanufacturing production scheduling. Su et al 12 proposed a fuzzy genetic algorithm to solve the integrated optimization of steel production.…”
Section: Introductionmentioning
confidence: 99%