2013
DOI: 10.1007/s12205-013-0287-z
|View full text |Cite
|
Sign up to set email alerts
|

An approximate cost estimation model based on standard quantities of steel box girder bridge substructure

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
3
1

Citation Types

0
4
0

Year Published

2014
2014
2024
2024

Publication Types

Select...
6

Relationship

0
6

Authors

Journals

citations
Cited by 6 publications
(4 citation statements)
references
References 14 publications
0
4
0
Order By: Relevance
“…RA is one of the most commonly used techniques in statistical modeling and has been used to make both direct (Bowen & Edwards, 1985;Khosrowshahi & Kaka, 1996;Kim et al, 2004;Lowe et al, 2006) and indirect construction cost estimates based on CMQ estimates (Bakhoum et al, 1998;Chou et al, 2006;Du & Bormann, 2014;Fragkakis et al, 2011;Kim et al, 2009;Oh et al, 2013;Singh, 1990Singh, , 1991Son et al, 2013;Yeh, 1998). RA is one of the most commonly used techniques in statistical modeling and has been used to make both direct (Bowen & Edwards, 1985;Khosrowshahi & Kaka, 1996;Kim et al, 2004;Lowe et al, 2006) and indirect construction cost estimates based on CMQ estimates (Bakhoum et al, 1998;Chou et al, 2006;Du & Bormann, 2014;Fragkakis et al, 2011;Kim et al, 2009;Oh et al, 2013;Singh, 1990Singh, , 1991Son et al, 2013;Yeh, 1998).…”
Section: Model Types Included In Proposed Processmentioning
confidence: 99%
See 1 more Smart Citation
“…RA is one of the most commonly used techniques in statistical modeling and has been used to make both direct (Bowen & Edwards, 1985;Khosrowshahi & Kaka, 1996;Kim et al, 2004;Lowe et al, 2006) and indirect construction cost estimates based on CMQ estimates (Bakhoum et al, 1998;Chou et al, 2006;Du & Bormann, 2014;Fragkakis et al, 2011;Kim et al, 2009;Oh et al, 2013;Singh, 1990Singh, , 1991Son et al, 2013;Yeh, 1998). RA is one of the most commonly used techniques in statistical modeling and has been used to make both direct (Bowen & Edwards, 1985;Khosrowshahi & Kaka, 1996;Kim et al, 2004;Lowe et al, 2006) and indirect construction cost estimates based on CMQ estimates (Bakhoum et al, 1998;Chou et al, 2006;Du & Bormann, 2014;Fragkakis et al, 2011;Kim et al, 2009;Oh et al, 2013;Singh, 1990Singh, , 1991Son et al, 2013;Yeh, 1998).…”
Section: Model Types Included In Proposed Processmentioning
confidence: 99%
“…One way to make preliminary estimates is to determine the amount of construction material quantities (CMQs) to be used in the project (Bakhoum, Morcous, Taha, & El-Said, 1998;Chou, Peng, Persad, & O'Connor, 2006;Du & Bormann, 2014;Fragkakis, Lambropoulos, & Tsiambaos, 2011;Kim, Kim, & Kang, 2009;Oh, Park, & Kim, 2013;Singh, 1990Singh, , 1991 Background One way to make preliminary estimates is to determine the amount of construction material quantities (CMQs) to be used in the project (Bakhoum, Morcous, Taha, & El-Said, 1998;Chou, Peng, Persad, & O'Connor, 2006;Du & Bormann, 2014;Fragkakis, Lambropoulos, & Tsiambaos, 2011;Kim, Kim, & Kang, 2009;Oh, Park, & Kim, 2013;Singh, 1990Singh, , 1991 Background…”
Section: Introductionmentioning
confidence: 99%
“…The accuracy of initial cost estimation is necessary to reach success in project budgeting. This depends on the available information and data related to the project (Oh, et al, 2013). The initial cost estimation often not accurate because of the incompleteness of the information and data.…”
Section: Introductionmentioning
confidence: 99%
“…A study about a model to an approximate cost estimate for a railway bridge project in the planning phase was done by Kim (2011) using CBR (Case Based Reasoning) method. A study about abutment, pier, and foundation cost estimation model was carried out by Oh, et al (2013) based on standard quantity. The preliminary engineering cost estimation model for bridge projects was developed by Hollar, et al (2013) based on preliminary cost estimation of completed projects using linear regression.…”
Section: Introductionmentioning
confidence: 99%