DOI: 10.26868/25222708.2019.210932
|View full text |Cite
|
Sign up to set email alerts
|

An Approach for the Extension of OpenBIM MEP Models with Metadata Focusing on Different Use Cases

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1
1
1
1

Citation Types

0
3
0

Publication Types

Select...
2
1

Relationship

1
2

Authors

Journals

citations
Cited by 3 publications
(4 citation statements)
references
References 0 publications
0
3
0
Order By: Relevance
“…As a result of such imperfections and BIM's focus on the geometric description of building elements, topological information remains insufficient for reuse in building energy simulation, systems modelling, or other O&M scenarios (Hauer et al (2019)). Therefore, extracting and reusing HVAC system topology requires tools to automate retrieving existing information about HVAC components from BIM and mechanisms to enable users to check and enrich them with missing semantic relationships.…”
Section: Figure 1: Bim Issues Examples: (A) Missing Connectivity Rela...mentioning
confidence: 99%
“…As a result of such imperfections and BIM's focus on the geometric description of building elements, topological information remains insufficient for reuse in building energy simulation, systems modelling, or other O&M scenarios (Hauer et al (2019)). Therefore, extracting and reusing HVAC system topology requires tools to automate retrieving existing information about HVAC components from BIM and mechanisms to enable users to check and enrich them with missing semantic relationships.…”
Section: Figure 1: Bim Issues Examples: (A) Missing Connectivity Rela...mentioning
confidence: 99%
“…The presented IFCtoIDF tool used EnergyPlus and the IFC2x2 standard, but the tool is not published. Hauer et al analyze the presentability of HVAC components in the IFC schema [10]. The most important findings are that the IFC schema even in version IFC 4 does not yet provide sufficient options to represent all relevant components of a HVAC system.…”
Section: Related Workmentioning
confidence: 99%
“…To meet above requirements a universal concept was developed introduced by [8]. This concept was further developed within the scope of the project metaTGA and will be described in the following sections.…”
Section: Mep Bim Model Requirementsmentioning
confidence: 99%
“…On the one hand, one of the main reasons is, that current available standards for openBIM MEP models are not sufficient in terms of available information about which parameters need to be specified and provided [8]. Initia tives like bimobject 3 , MEPcontent 4 , BIM&CO 5 , NBS National BIM Library 6 etc.…”
Section: Introductionmentioning
confidence: 99%