An Ant Optimization Model for Unrelated Parallel Machine Scheduling with Energy Consumption and Total Tardiness

Abstract: This research considers an unrelated parallel machine scheduling problem with energy consumption and total tardiness. This problem is compounded by two challenges: differences of unrelated parallel machines energy consumption and interaction between job assignments and machine state operations. To begin with, we establish a mathematical model for this problem. Then an ant optimization algorithm based on ATC heuristic rule (ATC-ACO) is presented. Furthermore, optimal parameters of proposed algorithm are defined… Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
2
1
1
1

Citation Types

0
19
0

Year Published

2016
2016
2024
2024

Publication Types

Select...
7
1

Relationship

0
8

Authors

Journals

citations
Cited by 30 publications
(19 citation statements)
references
References 18 publications
0
19
0
Order By: Relevance
“…A hybridization of two methods, namely truncated branch-and-bound and TS, is proposed and compared to some of the metaheuristic algorithms from the exited approaches. The authors of [64] addressed UPMSPs by employing the power-down scheme in order to minimize total tardiness and total energy consumption. A mathematical model is formulated, then, Ant Optimization algorithm is proposed with Apparent Tardiness Cost (ATC) heuristic rule.…”
Section: Literature Reviewmentioning
confidence: 99%
“…A hybridization of two methods, namely truncated branch-and-bound and TS, is proposed and compared to some of the metaheuristic algorithms from the exited approaches. The authors of [64] addressed UPMSPs by employing the power-down scheme in order to minimize total tardiness and total energy consumption. A mathematical model is formulated, then, Ant Optimization algorithm is proposed with Apparent Tardiness Cost (ATC) heuristic rule.…”
Section: Literature Reviewmentioning
confidence: 99%
“…The turning On and Off strategy was first proposed by Mouzon et al (2007) for single-machine scheduling problem and had been proven highly effective in saving idle energy when a machine tool was idling for a long time. Subsequently, the turning On and Off strategy has been gradually applied to single-machine scheduling (Yildirim and Mouzon 2012;Shrouf et al 2014;Che et al 2017), parallel machine scheduling (Liang et al 2015), HFSP-UPM (Dai et al 2013) and flexible job-shop scheduling ). Yildirim and Mouzon (2012) developed a nonlinear mathematical model to minimise the energy consumption and the total completion time of a single machine simultaneously, and a multi-objective genetic algorithm was employed to solve this problem.…”
Section: Literature Reviewmentioning
confidence: 99%
“…An unrelated parallel machine scheduling problem is investigated in [16]. Idling and setup are explicitly defined as machine states, which require to be assigned.…”
Section: B Energy-cost-aware Production Schedulingmentioning
confidence: 99%
“…Only one job is executed at one time without preemption, as constrained in (15) and (16). All jobs should be scheduled to a unique position, as described in (17).…”
Section: Ts T T T T T T Dt T Dt Dmentioning
confidence: 99%
See 1 more Smart Citation