2016 Power Systems Computation Conference (PSCC) 2016
DOI: 10.1109/pscc.2016.7540862
|View full text |Cite
|
Sign up to set email alerts
|

An adaptive model-based real-time voltage control process for Active Distribution Networks using Battery Energy Storage Systems

Abstract: Abstract-

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
2
1
1

Citation Types

0
4
0

Year Published

2018
2018
2020
2020

Publication Types

Select...
3
2

Relationship

1
4

Authors

Journals

citations
Cited by 5 publications
(4 citation statements)
references
References 13 publications
(20 reference statements)
0
4
0
Order By: Relevance
“…This optimization problem is nonconvex due to the nonconvex constraints ( 9), (10) and (11). To efficiently find a local optimal solution, constraint ( 9) is firstly convexified to:…”
Section: Proposed Methodologymentioning
confidence: 99%
See 1 more Smart Citation
“…This optimization problem is nonconvex due to the nonconvex constraints ( 9), (10) and (11). To efficiently find a local optimal solution, constraint ( 9) is firstly convexified to:…”
Section: Proposed Methodologymentioning
confidence: 99%
“…Another contribution proposed in this work is the design of a real-time control algorithm with time resolution ≤ 1s, capable of computing the maximum grid support from the BESS for different battery and AC grid conditions. This is done by solving in real time an optimization problem that includes constraints based on battery status predictions, given a three-time-constant (TTC) equivalent model whose parameters have been experimentally estimated via a series of model identification tests [10], [11]. We propose a computationallyefficient algorithm to find an optimal solution of the power set points.…”
Section: Introductionmentioning
confidence: 99%
“…Compared to the dual structure of 'grid-load' in a traditional distribution network, ADN is the three-dimensional structure 'DG-grid-load', which can analyze and predict the performance of DGs more actively, that is, eliminate the impact of DERs on the power grid as soon as possible [15][16][17].…”
Section: Evaluation Index Definitionmentioning
confidence: 99%
“…Considering that -from the system's point of viewthe storage DC-side limits represent time-dependant activepower limits, an alternative solution can be considered [7]. To tackle this issue, a method for ranking resources in real-time according to their suitability for becoming slack was proposed in [8].…”
Section: Introductionmentioning
confidence: 99%