1996
DOI: 10.2172/658951
|View full text |Cite
|
Sign up to set email alerts
|

Alternative generation and analysis for phase I privatization transfer system needs

Abstract: The document provides i d e n t i f i c a t i o n o f waste t r a n s f e r routes f o r high-level waste and l o w-a c t i v i t y waste staging i n support o f Phase I P r i v a t i z a t i o n. The recommended a l t e r n a t i v e has been approved by DOE-RL

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1
1
1

Citation Types

0
21
0

Year Published

1996
1996
1998
1998

Publication Types

Select...
5

Relationship

0
5

Authors

Journals

citations
Cited by 9 publications
(21 citation statements)
references
References 0 publications
0
21
0
Order By: Relevance
“…Action: Implement the transfer system upgrades (HLW Option 3) recommended in Galbraith et al (1996) and consistent with the "Base Case" waste transfer schedule described in this document.…”
Section: Recommendationsmentioning
confidence: 99%
See 2 more Smart Citations
“…Action: Implement the transfer system upgrades (HLW Option 3) recommended in Galbraith et al (1996) and consistent with the "Base Case" waste transfer schedule described in this document.…”
Section: Recommendationsmentioning
confidence: 99%
“…Status: The W-211 and W-314 schedules and scope are being modified so they are consistent with Galbraith et al (1996) and the TWRS O&UP.…”
Section: -1mentioning
confidence: 99%
See 1 more Smart Citation
“…This study is part of an integrated effort that includes the following documents: (Certa et al 1996) Operational Waste Volume Projection (Koreski and Strode 1996) Initial Retrieval Sequence and Blending Strategy (Penwell et al 1996) Neutralized Current Acid Waste Consolidation Management Pian (Powell 1996) Tank Waste Remediation System Phase I High-Level Waste Feed Processability Assessment Report (Lambert and Stegen 1996) Decision Document for Phase I Privatization Transfer System Needs (Galbraith et al 1996) TWRS Privatization Process Technical Baseline (Orme 1996).…”
Section: Background and Scopementioning
confidence: 99%
“…The basis is to pretreat the Phase I sludges and stage them sequentially from separate tanks to the private contractor's facility using existing transfer lines to the extent possible. Several waste transfer system routings, including new lines and upgrades, were evaluated to determine the preferred alternative for use in this study (Galbraith et al 1996).…”
mentioning
confidence: 99%