2012
DOI: 10.1016/j.procir.2012.07.021
|View full text |Cite
|
Sign up to set email alerts
|

Agent Oriented Construction of a Digital Factory for Validation of a Production Scenario

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
3
1
1

Citation Types

0
6
0

Year Published

2013
2013
2020
2020

Publication Types

Select...
3
2
1

Relationship

0
6

Authors

Journals

citations
Cited by 13 publications
(6 citation statements)
references
References 7 publications
0
6
0
Order By: Relevance
“…In case of large scale manufacturing systems, planning using multi agent for the autonomous decentralized assembly system is introduced with some advantages [10]. The structure of factory for agent module is described in hierarchical structure as shown in figure 1.…”
Section: B New Factory and New Process Planningmentioning
confidence: 99%
See 2 more Smart Citations
“…In case of large scale manufacturing systems, planning using multi agent for the autonomous decentralized assembly system is introduced with some advantages [10]. The structure of factory for agent module is described in hierarchical structure as shown in figure 1.…”
Section: B New Factory and New Process Planningmentioning
confidence: 99%
“…The structure of factory for agent module is described in hierarchical structure as shown in figure 1. In [11] the concept in [10] is tested through hypothetical problem-solving by building a virtual factory of automatic machines and workers. In [10,11] the authors used Artisoc which is a Japanese commercial multi agent simulator used by this paper to validate the multi agent autonomous assembly concept.…”
Section: B New Factory and New Process Planningmentioning
confidence: 99%
See 1 more Smart Citation
“…[9][10][11]) in which production lines are modelled statically. Based on these result, authors proposed using multi agent technology to model factory elements statically and dynamically [12][13]. Moreover, it is proposed to construct a digital eco-factory using this agent based digital factory.…”
Section: A Digital Eco-factory As An It Support Toolmentioning
confidence: 99%
“…A minimum sub-process is a job which is executed on some resources. There are rules and methods such as methodology and optimized parameters for production line control, dispatching rules for scheduling and theory for machine allocations [8,13]. …”
Section: Fig 5 Activity Diagram For a Product Agentmentioning
confidence: 99%