2018
DOI: 10.1016/j.energy.2018.04.061
|View full text |Cite
|
Sign up to set email alerts
|

Affine nonlinear control for an ultra-supercritical coal fired once-through boiler-turbine unit

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
3
1
1

Citation Types

0
9
0

Year Published

2019
2019
2024
2024

Publication Types

Select...
6
3

Relationship

1
8

Authors

Journals

citations
Cited by 34 publications
(9 citation statements)
references
References 22 publications
0
9
0
Order By: Relevance
“…There is a 30% boiler maximum continuous rating capacity electric speed feed pump, which is used only for the unit to start and not to do hot standby. The boiler export steam parameter is 25.4MPa(a)/571℃/569℃, and the boiler maximum continuous rating of 2250t/h [9,10].…”
Section: Unit Profilementioning
confidence: 99%
“…There is a 30% boiler maximum continuous rating capacity electric speed feed pump, which is used only for the unit to start and not to do hot standby. The boiler export steam parameter is 25.4MPa(a)/571℃/569℃, and the boiler maximum continuous rating of 2250t/h [9,10].…”
Section: Unit Profilementioning
confidence: 99%
“…(1) The elements of y(t), K(t, s 1 ) L m j m (t, s 1 , s 2 ) (see Equation ( 17)) are twice continuously differentiable functions with respect to the set of arguments, (2)…”
Section: Volterra Polynomial Equations Of the First Kind In The Probl...mentioning
confidence: 99%
“…(1) Problems with statistical or dynamic technological criteria (optimization of the basic parameters of the boiler unit [2], temperature control [3], maximum efficiency of combustion processes [4,5], changes in design parameters [6], etc. ); (2) Problems with statistical or dynamic technical and economic criteria (energy-saving of thermal energy [7], minimization of operating costs [8], maximum profit [9], etc.…”
Section: Introductionmentioning
confidence: 99%
“…The combustion system of 1000 MW ultra‐supercritical coal‐fired once‐through boiler‐turbine units is taken for example in this paper. Due to the high complexity, nonlinearity, multi‐variable, strong coupling and large delay characters of the ultra‐supercritical once‐through boiler [27], the controlling faces great challenges in actual operation. Therefore a virtual experiment for the complex control system.…”
Section: Introductionmentioning
confidence: 99%