Day 2 Wed, March 27, 2019 2019
DOI: 10.2118/194233-ms
|View full text |Cite
|
Sign up to set email alerts
|

Advancement in Spoolable Dimple Connector Design Provides Reliable Coiled Tubing Interventions in Extended Reach Wells

Abstract: On the Norwegian continental shelf, well interventions often use wireline's relatively small equipment footprint and weight. However, some operations still require fluid conveyance to specific depths, for which coiled tubing (CT) remains the only possible, economic option. Challenges related to reach and to achieving high annular velocity require the use of large-diameter CT. However, with crane capacity ranging from 30 to 48 t, lifting such strings is not possible. The alternative is joining CT pipes offshore… Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...

Citation Types

0
0
0

Year Published

2020
2020
2020
2020

Publication Types

Select...
1

Relationship

0
1

Authors

Journals

citations
Cited by 1 publication
references
References 3 publications
0
0
0
Order By: Relevance