2022
DOI: 10.1109/jestie.2020.3041704
|View full text |Cite
|
Sign up to set email alerts
|

Advanced Control Strategy With Voltage Sag Classification for Single-Phase Grid-Connected Photovoltaic System

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
2
1
1
1

Citation Types

0
16
0

Year Published

2022
2022
2024
2024

Publication Types

Select...
8
1
1

Relationship

2
8

Authors

Journals

citations
Cited by 44 publications
(16 citation statements)
references
References 36 publications
0
16
0
Order By: Relevance
“…Active and reactive power control methods are discussed in [10]- [12], particularly in IBG connected as distributed generation. Most of the research found in the literature focuses on issues related to transient voltage recovery especially, fault Ride-Through(FTR) or Low Voltage Ride-Through (LVRT) upon clearance of a fault [13]- [15]. Reactive power priority can inject more active and reactive power during the voltage recovery period compared to active priority control, resulting in improved frequency nadir [14].…”
Section: Related Previous Workmentioning
confidence: 99%
“…Active and reactive power control methods are discussed in [10]- [12], particularly in IBG connected as distributed generation. Most of the research found in the literature focuses on issues related to transient voltage recovery especially, fault Ride-Through(FTR) or Low Voltage Ride-Through (LVRT) upon clearance of a fault [13]- [15]. Reactive power priority can inject more active and reactive power during the voltage recovery period compared to active priority control, resulting in improved frequency nadir [14].…”
Section: Related Previous Workmentioning
confidence: 99%
“…Where L is the minimum inductance for CCM mode, C is the output capacitor, R is the nominal load, Db is the duty cycle and 𝐷 𝑏 ′=(1 − 𝐷 𝑏 ). Considering the modulation gain KPWM, the loop gain for the current-loop is expressed in (38): The current compensator regulates the battery current at the reference value (5A). The frequency-analysis parameters for the buffer stage are given in Table IV.…”
Section: Buffer Stage Topologymentioning
confidence: 99%
“…Once the abnormality in the grid is identified, it is not recommended to disconnect DGs instantaneously, as it may affect the grid stability [113]. Hence, it is recommended by the grid codes to impose fault ride through or low voltage ride through, which involve the PV system remaining connected with the grid and injecting a reactive current into the grid to maintain power stability and assist in voltage recovery [114,115].…”
Section: Low Voltage Ride Through (Lvrt)mentioning
confidence: 99%