Adaptive‐robust multi‐resolution generation maintenance scheduling with probabilistic reliability constraint

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1
1
1
1

Citation Types

0
5
0

Year Published

2021
2021
2023
2023

Publication Types

Select...
5
1

Relationship

1
5

Authors

Journals

citations
Cited by 9 publications
(5 citation statements)
references
References 43 publications
0
5
0
Order By: Relevance
“…Therefore, assigning appropriate big-M values can be a challenging task. On the other hand, the proposed BCD-based solution method does not have dualization or subsequent linearization, and, therefore, does not require setting the big-M values for the lower and upper limits of the dual variables [27], [34]. In addition, unlike the nested C&CG algorithm that uses binary modeling variables to construct polyhedral uncertainty sets (since these binary auxiliary variables are required by the disjunctive programming and linearization techniques), the BCD-based method uses the real continuous form of uncertainties in the polyhedral uncertainty set as indicated in ( 3) and ( 4).…”
Section: Solution Methodologymentioning
confidence: 99%
See 3 more Smart Citations
“…Therefore, assigning appropriate big-M values can be a challenging task. On the other hand, the proposed BCD-based solution method does not have dualization or subsequent linearization, and, therefore, does not require setting the big-M values for the lower and upper limits of the dual variables [27], [34]. In addition, unlike the nested C&CG algorithm that uses binary modeling variables to construct polyhedral uncertainty sets (since these binary auxiliary variables are required by the disjunctive programming and linearization techniques), the BCD-based method uses the real continuous form of uncertainties in the polyhedral uncertainty set as indicated in ( 3) and ( 4).…”
Section: Solution Methodologymentioning
confidence: 99%
“…Therefore, one-side bounded intervals for the uncertain variables have been considered in the uncertainty set Θ. In addition, unlike other adaptive RO methods, the proposed BCD method does not require binary modeling variables to construct the polyhedral uncertainty set and can directly work with the continuous modeling variables Z ele tdh and Z Thermal tdh as indicated in ( 3) and ( 4) [27]. In the uncertainty set Θ, a pre-defined uncertainty budget in (5), i.e., Γ, has been used to control the robustness of the solution.…”
Section: Uncertainty Characterizationmentioning
confidence: 99%
See 2 more Smart Citations
“…The model is formulated as non‐linear and solved by using the genetic algorithm. In [24], by considering the cost from energy not supplied, the GMS plan is based on the reliability‐constrained adaptive‐robust multi‐resolution. The energy not supplied is calculated by adapting the uncertainty of load, wind power generation, and equipment unavailability, whereas the bender decomposition is used to solve the problem.…”
Section: Introductionmentioning
confidence: 99%