Adaptive real-time tracking and simulation of heavy construction operations for look-ahead scheduling

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
3
1
1

Citation Types

0
36
0

Year Published

2013
2013
2024
2024

Publication Types

Select...
4
3
2

Relationship

0
9

Authors

Journals

citations
Cited by 96 publications
(37 citation statements)
references
References 10 publications
0
36
0
Order By: Relevance
“…This method has been widely used for utilization of container relocation problem by Jin, Zhu, & Lim [14] and Zhu & Lim [15]. Look-ahead method aims to take into account and react to changes in real-time systems [16]. Hence through this method two to five trucks behind the queue before it reaches the point for dispatching, the trucks have to know in advance the loader point which will be addressed based on the needs of each shovel to transport and based on a production target that has been set.…”
Section: Methodsmentioning
confidence: 99%
“…This method has been widely used for utilization of container relocation problem by Jin, Zhu, & Lim [14] and Zhu & Lim [15]. Look-ahead method aims to take into account and react to changes in real-time systems [16]. Hence through this method two to five trucks behind the queue before it reaches the point for dispatching, the trucks have to know in advance the loader point which will be addressed based on the needs of each shovel to transport and based on a production target that has been set.…”
Section: Methodsmentioning
confidence: 99%
“…For instance, from an array of GPS readings coming from a receiver attached to a truck, we need to identify when the truck starts traveling to the dumping location or how long it has been in a queue before it is serviced by a loader. Although a similar concept has been proposed before (Song & Eldin, 2012), the proposed rules are restricted to one type of equipment, i.e. trucks, and several states, such as out of service, have not been covered.…”
Section: Rule-based Systemmentioning
confidence: 99%
“…time and cost, and also in order to make simulation results more realistic, the assumptions made at the point of the model design need to be constantly modified and attuned based on the actual state of the operation. Consequently, some research has been conducted on a mechanism to dynamically monitor the trend of changes in the model parameters and adapt the simulation model accordingly in real-time (Hammad & Zhang, 2011;Lu, Dai & Chen, 2007;Song & Eldin, 2012;Akhavian & Behzadan, 2012).…”
Section: Introductionmentioning
confidence: 99%
“…This procedure is known as reactive scheduling. Currently, the adaptation of construction schedules is a manual, time consuming, error prone, and therefore poorly supported process (Song and Eldin 2012). In practice, there exists a high demand for efficient and userfriendly concepts, which can integrate and evaluate actual data as well as compare and update schedules.…”
Section: Introductionmentioning
confidence: 99%