2021
DOI: 10.1109/tase.2020.2978890
|View full text |Cite
|
Sign up to set email alerts
|

Adaptive Preventive Maintenance for Flow Shop Scheduling With Resumable Processing

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
3
2

Citation Types

0
7
0

Year Published

2021
2021
2023
2023

Publication Types

Select...
6
2

Relationship

0
8

Authors

Journals

citations
Cited by 24 publications
(7 citation statements)
references
References 43 publications
0
7
0
Order By: Relevance
“…For example, machine breakdown may happen at any time. So, it is also necessary to consider a maintenance plan along with real-time scheduling [34].…”
Section: Fig 2 Smart Manufacturing Modulesmentioning
confidence: 99%
See 1 more Smart Citation
“…For example, machine breakdown may happen at any time. So, it is also necessary to consider a maintenance plan along with real-time scheduling [34].…”
Section: Fig 2 Smart Manufacturing Modulesmentioning
confidence: 99%
“…Maintenance activities are usually non-separable with production scheduling [32], [33], [35]. Based on [34], there are two main groups of maintenance: corrective maintenance (which involves repair during unexpected machine breakdown) and preventive maintenance (a condition where a planned schedule is executed before machine breakdown happens). On the other hand, the study in [14] classified the industrial maintenance strategies into four: reactive (perform maintenance during complete machine failure); corrective (identify and solve failures when it happens before total machine failure); preventive (performing regular maintenance to prevent partial or complete failure); and predictive (anticipate failures before it happens and guess the remaining useful life of the machine).…”
Section: Fig 2 Smart Manufacturing Modulesmentioning
confidence: 99%
“…In addition, Li et al 20 also considered the cost of total time occupied by machines in flow shop scheduling and took it as the optimization objective, proposed a balance method with the optimization objective of makespan, and applied this model to the actual situation of doctors' treatment, and achieved good results. Considering cost active adoption of dynamic scheduling and predictive scheduling is also an extension of FSP when machine is failure and maintenance during the production, and some achievements have been made in the related literature 21 23 research.…”
Section: Introductionmentioning
confidence: 99%
“…This method improved the convergence of the algorithm. Ye et al 50 proposed an adaptive strategy that introduced a correction factor to dynamically update the planned preventive maintenance interval. The strategy can achieve better results with lower total cost.…”
Section: Introductionmentioning
confidence: 99%