2013
DOI: 10.1049/iet-gtd.2012.0444
|View full text |Cite
|
Sign up to set email alerts
|

Adaptive enumeration method for the optimal interconnection planning of isolated power systems

Abstract: The target of this work is the determination of the optimal solution in transmission expansion planning in the particular case of isolated systems involving dc interconnections. Therefore special attention is given to dc-links modelling aspects for steady state analysis, as well as security constraints relevant to small sized systems operation. Therein lies the first contribution of this work, namely in the incorporation of operating reserve related considerations and simplified dc-links models in isolated sys… Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
2

Citation Types

0
2
0

Year Published

2016
2016
2021
2021

Publication Types

Select...
2
1

Relationship

0
3

Authors

Journals

citations
Cited by 3 publications
(2 citation statements)
references
References 39 publications
0
2
0
Order By: Relevance
“…At present, the solution techniques for their location and capacity optimal problems are attained via traditional mathematical programming methods or intelligent methods. However, with the increase of computational complexity and research scope, the conventional enumeration method cannot find the optimal solution [7]. In [8], an iterative mixed integer nonlinear programming approach is introduced to solve the optimal location and sizing of FCLs in mesh networks, which minimizes the total installed cost.…”
Section: Introductionmentioning
confidence: 99%
“…At present, the solution techniques for their location and capacity optimal problems are attained via traditional mathematical programming methods or intelligent methods. However, with the increase of computational complexity and research scope, the conventional enumeration method cannot find the optimal solution [7]. In [8], an iterative mixed integer nonlinear programming approach is introduced to solve the optimal location and sizing of FCLs in mesh networks, which minimizes the total installed cost.…”
Section: Introductionmentioning
confidence: 99%
“…During the past years, quite a lot of plans for interconnecting Aegean Sea islands among them and with the mainland Greece have been presented [1,2] while proposed methodology for transmission system reinforcement including such an interconnection has been provided in [3]. Their main scope is to exploit the rich renewable energy sources (RES) potential of the islands and improve reliability of supply with reduced operational costs.…”
Section: Introductionmentioning
confidence: 99%