2019 IEEE PES Innovative Smart Grid Technologies Europe (ISGT-Europe) 2019
DOI: 10.1109/isgteurope.2019.8905722
|View full text |Cite
|
Sign up to set email alerts
|

Adapted Newton-Raphson Power Flow Method for a DC Traction Network including Non-receptive Power Sources and Photovoltaic Systems

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
2
1
1
1

Citation Types

0
8
0

Year Published

2021
2021
2023
2023

Publication Types

Select...
3
2

Relationship

0
5

Authors

Journals

citations
Cited by 5 publications
(8 citation statements)
references
References 10 publications
0
8
0
Order By: Relevance
“…Unfortunately, these models are limited both in the modelling of the bus load and of the grid elements. Trolleygrid studies tend to limit themselves to a single section, with an ideal trapezoidal traction power load [3], [4], [12], [15], [16], [23], [24]. A trapezoidal profile assumes a constant acceleration phase from the bus stop, followed by a constant-velocity cruising at 50 km/hr, and then a deceleration toward the next bus stop.…”
Section: A Modelling Of Trolleygrids In Literaturementioning
confidence: 99%
“…Unfortunately, these models are limited both in the modelling of the bus load and of the grid elements. Trolleygrid studies tend to limit themselves to a single section, with an ideal trapezoidal traction power load [3], [4], [12], [15], [16], [23], [24]. A trapezoidal profile assumes a constant acceleration phase from the bus stop, followed by a constant-velocity cruising at 50 km/hr, and then a deceleration toward the next bus stop.…”
Section: A Modelling Of Trolleygrids In Literaturementioning
confidence: 99%
“…Ignored in works such as [15,16,23,52,[55][56][57][58][59][60], included in works such as [49,50] If ignored, errors up to 55% in substation energy calculations…”
Section: Bus Auxiliaries Powermentioning
confidence: 99%
“…Ideally, implied that it is modelled but it is not correct to include it while simultaneously ignoring the auxiliaries demand such as in [15,16,23,52,[55][56][57][58][59][60] If ignored, errors as high as 34% in the substation power calculations…”
Section: Bus Regenerative Brakingmentioning
confidence: 99%
See 1 more Smart Citation
“…The consensusbased solutions are also becoming more sophisticated, and in [7], Li et al proposed a distributed double-consensus approach to facilitate the cooperative energy management of multiple WEs, thereby introducing the concept of WEs. Recently, distributed solutions have evolved based on specific application needs, such as distributed Newtonian descent [8][9][10], and distributed methods based on neurodynamics [11,12].…”
Section: Introductionmentioning
confidence: 99%