2012 Sixth IEEE/PES Transmission and Distribution: Latin America Conference and Exposition (T&D-La) 2012
DOI: 10.1109/tdc-la.2012.6319129
|View full text |Cite
|
Sign up to set email alerts
|

Active power regulation of auxiliary generation units in hydroelectric power plants using power electronic switching

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1

Citation Types

0
1
0

Year Published

2013
2013
2015
2015

Publication Types

Select...
3
1

Relationship

0
4

Authors

Journals

citations
Cited by 4 publications
(1 citation statement)
references
References 18 publications
0
1
0
Order By: Relevance
“…Even short interruption of auxiliary services can result in miss-trip of the generator [10]. Even short interruption of auxiliary services can result in miss-trip of the generator [10].…”
Section: Auxiliary Generation Unitsmentioning
confidence: 99%
“…Even short interruption of auxiliary services can result in miss-trip of the generator [10]. Even short interruption of auxiliary services can result in miss-trip of the generator [10].…”
Section: Auxiliary Generation Unitsmentioning
confidence: 99%