2023
DOI: 10.1016/j.ijepes.2023.109411
|View full text |Cite
|
Sign up to set email alerts
|

Active distribution network type identification method of high proportion new energy power system based on source-load matching

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1

Citation Types

0
0
0

Year Published

2023
2023
2024
2024

Publication Types

Select...
3
1

Relationship

0
4

Authors

Journals

citations
Cited by 4 publications
(2 citation statements)
references
References 25 publications
0
0
0
Order By: Relevance
“…With the construction of a new power system and the gradual development of finegrained power load management [1][2][3], the diversified load short-term prediction technology for the demand side of the power system plays an important role in accurate management decision-making for diversified stations and load types [4]. Fine-grained management of power load [5] refers to the real-time monitoring and analysis, regulation, and optimization of power load to achieve accurate management of the power load, effectively improving the efficiency and stability of the power system and reducing energy consumption and pollution emissions, which is the trend and direction of the development of the modern power industry [6].…”
Section: Introductionmentioning
confidence: 99%
“…With the construction of a new power system and the gradual development of finegrained power load management [1][2][3], the diversified load short-term prediction technology for the demand side of the power system plays an important role in accurate management decision-making for diversified stations and load types [4]. Fine-grained management of power load [5] refers to the real-time monitoring and analysis, regulation, and optimization of power load to achieve accurate management of the power load, effectively improving the efficiency and stability of the power system and reducing energy consumption and pollution emissions, which is the trend and direction of the development of the modern power industry [6].…”
Section: Introductionmentioning
confidence: 99%
“…The planning approach proposed in this paper does not evaluate the effectiveness of source-load matching, which cannot assess the suitability of constructing an EHMES in the studied region. Future research could consider establishing a set of source-load matching indicators to quantify the matching effects, like the study in [46]. This effort would facilitate the preliminary selection of areas suitable for EHMES construction based on the wind and solar resources of the area.…”
mentioning
confidence: 99%