1978
DOI: 10.1007/bf01118081
|View full text |Cite
|
Sign up to set email alerts
|

Activation of concretes based on granite and limestone rubble

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
2

Citation Types

0
2
0

Year Published

1983
1983
2019
2019

Publication Types

Select...
2

Relationship

0
2

Authors

Journals

citations
Cited by 2 publications
(2 citation statements)
references
References 0 publications
0
2
0
Order By: Relevance
“…These problems should be solved in accordance with certain specific conditions. For example, due to the development and improvement of embankments [23].…”
Section: Resultsmentioning
confidence: 99%
See 1 more Smart Citation
“…These problems should be solved in accordance with certain specific conditions. For example, due to the development and improvement of embankments [23].…”
Section: Resultsmentioning
confidence: 99%
“…[13] In order to select the relevant option of the landscape-ecological arrangement of floodplain and coastal lands, one should carefully consider the mode of their operation. [23] This approach requires the maintenance of the ecological system of the area adjacent to the waterway, the maximum preservation of the biological corridor, as well as the activation of the water protection functionality of the floodplain, etc.…”
Section: Resultsmentioning
confidence: 99%