1979
DOI: 10.1109/tns.1979.4329865
|View full text |Cite
|
Sign up to set email alerts
|

Achievement and control of the 100 μA beam at triumf

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
2

Citation Types

0
2
0

Year Published

1979
1979
2024
2024

Publication Types

Select...
2

Relationship

0
2

Authors

Journals

citations
Cited by 2 publications
(2 citation statements)
references
References 6 publications
0
2
0
Order By: Relevance
“…To achieve this goal, an upgrade of the injection beamline has been commenced, which involves replacing the current one [3,4]. Additionally, a high-intensity and high-brightness ion source injection terminal (I2) will be constructed in parallel with the current ion source injection terminal (I1) [5].…”
Section: Introductionmentioning
confidence: 99%
See 1 more Smart Citation
“…To achieve this goal, an upgrade of the injection beamline has been commenced, which involves replacing the current one [3,4]. Additionally, a high-intensity and high-brightness ion source injection terminal (I2) will be constructed in parallel with the current ion source injection terminal (I1) [5].…”
Section: Introductionmentioning
confidence: 99%
“…Both magnetostatic and electrostatic based low energy beam transport (LEBT) are used in other accelerator facilities worldwide [7,8]. The current LEBT (12 keV) at the I1 source terminal comprises electrostatic optical elements like an einzel lens and electrostatic steerers [5]. In the new design the LEBT(25 -30 keV) section incorporates magnetic optical elements, such as magnetic steerers and a permanent magnet lens.…”
Section: Introductionmentioning
confidence: 99%