Design, Automation and Test in Europe
DOI: 10.1109/date.2005.47
|View full text |Cite
|
Sign up to set email alerts
|

Accurate Reliability Evaluation and Enhancement via Probabilistic Transfer Matrices

Abstract: Abstract

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
3
2

Citation Types

0
139
0
2

Publication Types

Select...
3
3

Relationship

0
6

Authors

Journals

citations
Cited by 225 publications
(141 citation statements)
references
References 12 publications
0
139
0
2
Order By: Relevance
“…Compared to this improved matrix method, our BP method still shows significant advantage. For example: the circuit 9symm1 (9 inputs, 1 outputs, 44 gates) in [3] has comparable size and complexity with the 4-bit adders in our simulations. It took 1758 seconds and 1200MB to compute SER of this circuit in [3].…”
Section: Simulations and Comparisons Withmentioning
confidence: 98%
See 4 more Smart Citations
“…Compared to this improved matrix method, our BP method still shows significant advantage. For example: the circuit 9symm1 (9 inputs, 1 outputs, 44 gates) in [3] has comparable size and complexity with the 4-bit adders in our simulations. It took 1758 seconds and 1200MB to compute SER of this circuit in [3].…”
Section: Simulations and Comparisons Withmentioning
confidence: 98%
“…For example: the circuit 9symm1 (9 inputs, 1 outputs, 44 gates) in [3] has comparable size and complexity with the 4-bit adders in our simulations. It took 1758 seconds and 1200MB to compute SER of this circuit in [3]. Another example is circuit pm1 (27 inputs, 17 outputs, 24 gates), which took 7169 seconds and 160MB to calculate its SER in [3].…”
Section: Simulations and Comparisons Withmentioning
confidence: 98%
See 3 more Smart Citations