2017
DOI: 10.1166/asl.2017.8767
|View full text |Cite
|
Sign up to set email alerts
|

Accuracy Improvement of the Estimations Effort in Constructive Cost Model II Based on Logic Model of Fuzzy

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1
1
1
1

Citation Types

0
4
0
5

Year Published

2017
2017
2023
2023

Publication Types

Select...
4
3

Relationship

2
5

Authors

Journals

citations
Cited by 13 publications
(9 citation statements)
references
References 0 publications
0
4
0
5
Order By: Relevance
“…f. Update velocity and position of the optimization based on equation 3and (4). The new regulatory formula for parameter A in equation (5) and (6), similarly for parameter B in equation 7and (8). The equation for updating the velocity and position of parameter A is given as follows…”
Section: Methodsmentioning
confidence: 99%
See 1 more Smart Citation
“…f. Update velocity and position of the optimization based on equation 3and (4). The new regulatory formula for parameter A in equation (5) and (6), similarly for parameter B in equation 7and (8). The equation for updating the velocity and position of parameter A is given as follows…”
Section: Methodsmentioning
confidence: 99%
“…The technique of algorithmic refers to the existence of a mathematical equation to estimate software costs, whereas non-algorithmic techniques refer to the absence of mathematical equations to estimate software costs [3]. This includes the analogy method [4], artificial neural network [5,6], fuzzy logic [7,8], genetic algorithm [9], and Cuckoo optimalization [10]. The cost estimated is expressed in terms of currency ($).…”
Section: Introductionmentioning
confidence: 99%
“…Kemampuan pemodelan baru yang utama pada COCOMO II adalah model software sizing, yang melibatkan Object Points, Function Points, LOC, model nonlinear untuk digunakan kembali pada perangkat lunak dan rekayasa ulang, pendekatan eksponen untuk pemodelan disekonomi software skala relative, dan beberapa penambahan, penghapusan, serta update cost driver dari COCOMO sebelumnya. Adapun beberapa penelitian sebelumnya yang menggunakan metode ini menggunakan fuzzy trapesium untuk merancang ulang EM dari COCOMO II agar hasil EM lebih akurat [14]. Akan tetapi, penelitian berikut memperbaiki hasil akurasi COCOMO II menggunakan FG, karena jika menggunakan fuzzy trapesium, transisinya tidak sebaik Gaussian, sehingga hasil yang dicapai masih jauh dari Actual Effort [5].…”
Section: A Constructive Cost Model IIunclassified
“…• Menghitung MRE di tiap lebah yang sudah mencari nilai E. • Membandingkan hasil akurasi estimasi usaha dan biaya menggunakan COCOMO II FG pada data set Cocomosdr dan NASA 93-dem [14].…”
Section: B Metode Bee Colony Optimizationunclassified
See 1 more Smart Citation