2014
DOI: 10.4028/www.scientific.net/amm.672-674.2221
|View full text |Cite
|
Sign up to set email alerts
|

Accounting “Pure” Risks in Early Stage of Investment in Construction Projects with Energy Efficient Technologies in Use

Abstract: Construction projects with energy-efficient technologies in use are systems that require more detailed analysis of potential risks than it could be in the evaluation of other construction projects. For that matter it is necessary to take into account non-economic "pure" project risks that are possible in the spheres, which traditional risk management does not consider in-depth. The traditional management of such "pure" risks comes down to estimating the extent of insurance coverage and redundancy in their impl… Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
2
2
1

Citation Types

0
1
0
1

Year Published

2016
2016
2021
2021

Publication Types

Select...
6
1

Relationship

2
5

Authors

Journals

citations
Cited by 7 publications
(7 citation statements)
references
References 2 publications
(1 reference statement)
0
1
0
1
Order By: Relevance
“…The pre-investment analysis of «pure» construction projects risks can be carried out with the help of the information analysis system, which, according to the input data describing the project, can identify potential risk events and propose methods for managing the identified risks [1]. The algorithm of how it works is described in Fig.…”
Section: Resultsmentioning
confidence: 99%
See 2 more Smart Citations
“…The pre-investment analysis of «pure» construction projects risks can be carried out with the help of the information analysis system, which, according to the input data describing the project, can identify potential risk events and propose methods for managing the identified risks [1]. The algorithm of how it works is described in Fig.…”
Section: Resultsmentioning
confidence: 99%
“…At this stage, the increasing or decreasing probability coefficients are assigned to the risks, which are characterised by extremely high or low values of the corresponding parameters when entering the input data; the risks not inherent in the object are excluded. The authors have already viewed in detail this process in their works [1,10].…”
Section: Resultsmentioning
confidence: 99%
See 1 more Smart Citation
“…любая трансформация или разворот тренда развития в современных условиях невозможны без инвестиционного обеспечения, эффективной кредитно-денежной, таможенной политики, ориентированной на экономический рост [22]. При этом независимо от масштаба, региональной, отраслевой, видовой принадлежности и иных характеристик инвестиционного проекта каждый проект должен вносить вклад и быть направлен на общую глобальную цель [23].…”
Section: вестник мгсу том 12 выпуск 6 (105)unclassified
“…Designers have and will continue to have new tools for automation of their activities [6], designing a single facility, now the best engineers distributed throughout the country can deal with it, and also, more and more often, it is practiced to attract foreign specialists. BIM technology is not limited to solving problems related to design, but also allows management of construction deals with the issues of time organization of the construction process including logistical support, well-timed delivery of construction material, carcasses and goods to warehouses and construction sites [7,8] and at the operational stage too [9]. Despite these colossal innovations, the conservatism of designers, because of the high standardization of their activities, does not allow the design system to develop in full [10].…”
Section: Introductionmentioning
confidence: 99%