2013
DOI: 10.15554/pcij.03012013.32.36
|View full text |Cite
|
Sign up to set email alerts
|

Accelerated construction for a bridge in rural Texas

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1

Citation Types

0
1
0

Year Published

2016
2016
2016
2016

Publication Types

Select...
1

Relationship

0
1

Authors

Journals

citations
Cited by 1 publication
(1 citation statement)
references
References 0 publications
0
1
0
Order By: Relevance
“…The main goal of the bridge construction will be to reduce the number of miles traveled and increase mobility [7]. The savings are assessed using the lifecycle benefit-cost model.…”
Section: Introductionmentioning
confidence: 99%
“…The main goal of the bridge construction will be to reduce the number of miles traveled and increase mobility [7]. The savings are assessed using the lifecycle benefit-cost model.…”
Section: Introductionmentioning
confidence: 99%