Day 1 Tue, October 12, 2021 2021
DOI: 10.2118/205768-ms
|View full text |Cite
|
Sign up to set email alerts
|

A Wellbore Pressure Calculation Method Considering Gas Suspension in Wellbore Shut-In Condition

Abstract: In the oil industry, the drilling fluid is yield stress fluid. The gas invading the wellbore during the drilling process is distributed in the wellbore in the form of bubbles. When the buoyancy of the bubble is less than the resistance of the yield stress, the bubble will be suspended in the drilling fluid, which will lead to wellbore pressure inaccurately predicting and overflow. In this paper, the prediction model of gas limit suspension concentration under different yield stresses of drilling fluids is obta… Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...

Citation Types

0
0
0

Year Published

2022
2022
2023
2023

Publication Types

Select...
2
1

Relationship

0
3

Authors

Journals

citations
Cited by 3 publications
references
References 12 publications
0
0
0
Order By: Relevance