All Days 2012
DOI: 10.2118/161280-ms
|View full text |Cite
|
Sign up to set email alerts
|

A Unique Integrated Asset Modeling Solution to Optimize and Manage Uncertainty in a Giant Offshore Oil Field Development Mega-Project

Abstract: This paper presents the application of an integrated modeling approach to the facility design and construction stages of a mega-project for a giant oilfield offshore Abu Dhabi. The scale of the EPC task is unprecedented in the UAE and requires careful design to optimize the capital investment. In addition, the project uncertainties require that a high degree of flexibility be factored into the design process. The integrated modeling approach couples surface and subsurface flow models to achieve … Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1

Citation Types

0
1
0

Year Published

2015
2015
2018
2018

Publication Types

Select...
1
1

Relationship

0
2

Authors

Journals

citations
Cited by 2 publications
(1 citation statement)
references
References 5 publications
0
1
0
Order By: Relevance
“…This goal of having a single effective modeling solution for the entire asset from geological interpretation through to sales contracts and taxation can be achieved via integrated asset modeling (Khedr et al 2012). At every phase of asset development and production, simulation plays a vital role in supporting strategic, tactical and operational decisions.…”
Section: Introductionmentioning
confidence: 99%
“…This goal of having a single effective modeling solution for the entire asset from geological interpretation through to sales contracts and taxation can be achieved via integrated asset modeling (Khedr et al 2012). At every phase of asset development and production, simulation plays a vital role in supporting strategic, tactical and operational decisions.…”
Section: Introductionmentioning
confidence: 99%