A type-2 fuzzy set model for contractor prequalification

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
2
2
1

Citation Types

0
38
0

Year Published

2019
2019
2023
2023

Publication Types

Select...
6
2
1

Relationship

1
8

Authors

Journals

citations
Cited by 46 publications
(38 citation statements)
references
References 27 publications
0
38
0
Order By: Relevance
“…Table 1 shows the most commonly cited criteria dealing with "Contractor selection criteria" or "Contractor pre-qualification criteria". Furthermore, the researchers suggested other criteria, such as risk [19], environment [20,34], equipment resources and current workload [19,21,22,37,38], company characteristics [2] and business ethics [10], legal capacity [7,10,15], warranty [1,10], design [15,18], and firm background innovative capabilities [23].…”
Section: Criteria Consideredmentioning
confidence: 99%
See 1 more Smart Citation
“…Table 1 shows the most commonly cited criteria dealing with "Contractor selection criteria" or "Contractor pre-qualification criteria". Furthermore, the researchers suggested other criteria, such as risk [19], environment [20,34], equipment resources and current workload [19,21,22,37,38], company characteristics [2] and business ethics [10], legal capacity [7,10,15], warranty [1,10], design [15,18], and firm background innovative capabilities [23].…”
Section: Criteria Consideredmentioning
confidence: 99%
“…Hashemi et al [36] proposed a group decision model based on Grey-Intuitionistic Fuzzy-ELECTRE and VIKOR (VIšekriterijumsko KOmpromisno Rangiranje) approaches to handle the contractor evaluation problem. Afshar et al [37] proposed a type-2 Fuzzy set for contractor prequalification. Ulubeyli and Kazaz [38] developed a subcontractor selection model (CoSMo) based on Fuzzy set theory.…”
Section: Introductionmentioning
confidence: 99%
“…Moreover, contractor or subcontractor prequalification and selection have been presented by several researchers, applying Fuzzy Sets (Niento-Morote & Ruz-Vila, 2012; Afshar, Alipouri, Sebt, & Chan, 2017;Alhumaidi, 2015;Nassar & Hosny, 2013;Plebankiewicz, 2012) and Fuzzy Sets approaches combine with MCDM techniques: Fuzzy AHP (Nyongesa, Musumba, & Chileshe, 2017), Fuzzy AHP and Fuzzy TOPSIS (Taylan, Kabli, Porcel, & Herrera-Viedma, 2018;Polat, Eray, & Bingol, 2017;Nasab & Ghamsarian, 2015), Fuzzy Set Theory and EDAS (Keshavarz Ghorabaee, Amiri, Zavadskas, Turskis, & Antuchevičienė, 2018), Fuzzy ELECTRE (Hashemi, Mousavi, Zavadskas, Chalekaee, & Turskis, 2018).…”
Section: Contractor Selection Approachesmentioning
confidence: 99%
“…Keshavarz Ghorabaee, Amiri, Zavadskas, Turskis, and Antuchevičienė (2018) presented subcontractor evaluation, developing a dynamic Fuzzy approach based on EDAS technique. Contractor prequalification was proposed by Afshar, Alipouri, Sebt, and Chan (2017), developing a type-2 Fuzzy set. Alhumaidi (2015) used Fuzzy Set method for construction contractor selection.…”
Section: Contractor Selection Approachesmentioning
confidence: 99%