A two-stage stochastic rule-based model to determine pre-assembly buffer content

Abstract: This study considers instant decision-making needs of the automobile manufactures for resequencing vehicles before final assembly (FA). We propose a rule-based two-stage stochastic model to determine the number of spare vehicles that should be kept in the pre-assembly buffer to restore the altered sequence due to paint defects and upstream department constraints. First stage of the model decides the spare vehicle quantities, where the second stage model recovers the scrambled sequence respect to pre-defined ru… Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1

Citation Types

0
1
0

Year Published

2019
2019
2021
2021

Publication Types

Select...
2

Relationship

0
2

Authors

Journals

citations
Cited by 2 publications
(1 citation statement)
references
References 18 publications
0
1
0
Order By: Relevance
“…Rule-based methods are widely used in many fields (e.g. assembly lines, 10 design evaluation, 11 etc. ).…”
Section: Methodsmentioning
confidence: 99%
“…Rule-based methods are widely used in many fields (e.g. assembly lines, 10 design evaluation, 11 etc. ).…”
Section: Methodsmentioning
confidence: 99%