2011 Chinese Control and Decision Conference (CCDC) 2011
DOI: 10.1109/ccdc.2011.5968846
|View full text |Cite
|
Sign up to set email alerts
|

A two-stage heuristic method for vulcanization production scheduling

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1

Citation Types

0
1
0

Year Published

2012
2012
2020
2020

Publication Types

Select...
2

Relationship

0
2

Authors

Journals

citations
Cited by 2 publications
(1 citation statement)
references
References 2 publications
0
1
0
Order By: Relevance
“…Mukhopadhyay and Shanker [2005] and Karabıçak et al [2017] study the implementation in the production line of a tire manufacturer of the Kanban and Kaizen systems, respectively. Yu et al [2011Yu et al [ , 2012Yu et al [ , 2013 provide heuristic procedures and simulation analysis for tire curing scheduling problems under particular specifications. Arslankaya and C ¸alık [2016] study the production process of trial tires by means of simulation tech-niques aiming to improve the productivity of a tire manufacturer.…”
Section: Introductionmentioning
confidence: 99%
“…Mukhopadhyay and Shanker [2005] and Karabıçak et al [2017] study the implementation in the production line of a tire manufacturer of the Kanban and Kaizen systems, respectively. Yu et al [2011Yu et al [ , 2012Yu et al [ , 2013 provide heuristic procedures and simulation analysis for tire curing scheduling problems under particular specifications. Arslankaya and C ¸alık [2016] study the production process of trial tires by means of simulation tech-niques aiming to improve the productivity of a tire manufacturer.…”
Section: Introductionmentioning
confidence: 99%