2021
DOI: 10.1080/14488353.2021.1906831
|View full text |Cite
|
Sign up to set email alerts
|

A trustful transition zone for high-speed rail using stone columns

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1

Citation Types

0
1
0

Year Published

2021
2021
2024
2024

Publication Types

Select...
2
1

Relationship

0
3

Authors

Journals

citations
Cited by 3 publications
(1 citation statement)
references
References 5 publications
0
1
0
Order By: Relevance
“…However, the post construction differential settlement is mainly measured by electric level ruler and high-speed railway differential settlement monitor. The instruments are set in the side of concrete cushion, with electrical level ruler and single-point settlement meter used as verification methods, and multiple measuring points with certain intervals used for verification [7] . The electrical level ruler is placed outside the subgrade surface of the railway track, 10cm away from the edge.…”
Section: (2) Monitoring Instruments and Equipmentmentioning
confidence: 99%
“…However, the post construction differential settlement is mainly measured by electric level ruler and high-speed railway differential settlement monitor. The instruments are set in the side of concrete cushion, with electrical level ruler and single-point settlement meter used as verification methods, and multiple measuring points with certain intervals used for verification [7] . The electrical level ruler is placed outside the subgrade surface of the railway track, 10cm away from the edge.…”
Section: (2) Monitoring Instruments and Equipmentmentioning
confidence: 99%