A Systematical Framework of Schedule Risk Management for Power Grid Engineering Projects’ Sustainable Development

Abstract: Schedule risks are the main threat for high efficiency of schedule management in power grid engineering projects (PGEP). This paper aims to build a systematical framework for schedule risk management, which consists of three dimensions, including the personnel dimension, method dimension and time dimension, namely supervisory personnel, management methods and the construction process, respectively. Responsibilities of staff with varied functions are discussed in the supervisory personnel part, and six stages a… Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
3
1
1

Citation Types

0
7
0

Year Published

2017
2017
2024
2024

Publication Types

Select...
9
1

Relationship

0
10

Authors

Journals

citations
Cited by 17 publications
(7 citation statements)
references
References 23 publications
0
7
0
Order By: Relevance
“…Then based on this questionnaire data were collected. A22 Poor site performance and management [15,33] A23 Ineffective scheduling and planning [4,19,30,32] A24 Improper construction methods [19,22,33] A25 Poor coordination and communication with other [4,30,31] A26 Inadequate experience of the contractor [19,22,25] A27 Rework for unsatisfactory work [17,19,22] A3 Consultant A31 Inadequate consultant experience [15,19] A32 Late in receiving and approving of work [4,19,22,30] A33 Late in performing inspection and testing and poor supervision [34] A34 Poor coordination and communication with other [19] B42 Low efficiency and productivity of equipment [34] B42 Lack of spare parts and failures of equipment [4,17,30,31] B43 Problem of mobilization and allocation [16] B45 Equipment outdated [16,34] (C) Contrac condition C1 Absence of alternative dispute resolution (ADR) [4,30,33] C2 Discrepancies and mistakes in contract [33] C3 Unrealistic cost and duration contract [4,17,30] C4 Poor incentives and inadequate penalties in contract …”
Section: Set Significant Delay Risk Factorsmentioning
confidence: 99%
“…Then based on this questionnaire data were collected. A22 Poor site performance and management [15,33] A23 Ineffective scheduling and planning [4,19,30,32] A24 Improper construction methods [19,22,33] A25 Poor coordination and communication with other [4,30,31] A26 Inadequate experience of the contractor [19,22,25] A27 Rework for unsatisfactory work [17,19,22] A3 Consultant A31 Inadequate consultant experience [15,19] A32 Late in receiving and approving of work [4,19,22,30] A33 Late in performing inspection and testing and poor supervision [34] A34 Poor coordination and communication with other [19] B42 Low efficiency and productivity of equipment [34] B42 Lack of spare parts and failures of equipment [4,17,30,31] B43 Problem of mobilization and allocation [16] B45 Equipment outdated [16,34] (C) Contrac condition C1 Absence of alternative dispute resolution (ADR) [4,30,33] C2 Discrepancies and mistakes in contract [33] C3 Unrealistic cost and duration contract [4,17,30] C4 Poor incentives and inadequate penalties in contract …”
Section: Set Significant Delay Risk Factorsmentioning
confidence: 99%
“…Some recent works are as follows. Rao et al [16] constructed a schedule risk management framework for power grid engineering projects. The relationships among risks were determined by the ISM method first, and then a three-tier evaluation system was developed by the AHP.…”
Section: Interpretive Structural Modeling (Ism)mentioning
confidence: 99%
“…The above researches lay a good methodological foundation for the study of this paper. However, most of the researches on power grid project evaluation were based on serving enterprise decision-making, and chose a certain angle, such as risk [17][18][19], technology [20][21][22], and economy [23][24][25], to carry out. There is still a lack of relevant research from the perspective of government supervision to assess whether the power grid investment projects are reasonable and whether the cost is compliant, i.e., compliance with PGIB.…”
Section: Introductionmentioning
confidence: 99%