A systematic review of quantitative risk analysis in construction of mega projects

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1
1
1
1

Citation Types

0
10
0
1

Year Published

2021
2021
2024
2024

Publication Types

Select...
5
4

Relationship

0
9

Authors

Journals

citations
Cited by 31 publications
(15 citation statements)
references
References 5 publications
0
10
0
1
Order By: Relevance
“…The use of project risk control practices are essential to the growth and sustainability of construction operations, as there is a positive, statistically significant relationship between risk reassessment and project success (Obondi, 2022). The quantitative method is the most efficient and widely used in risk analysis, as it detects deviations in the budget and schedule using Monte Carlo analysis (Nabawy, M., & Khodeir, 2020). However, qualitative risk analysis is an effective method when the study aims to prioritize the order of dealing with risks.…”
Section: Literature Reviewmentioning
confidence: 99%
See 1 more Smart Citation
“…The use of project risk control practices are essential to the growth and sustainability of construction operations, as there is a positive, statistically significant relationship between risk reassessment and project success (Obondi, 2022). The quantitative method is the most efficient and widely used in risk analysis, as it detects deviations in the budget and schedule using Monte Carlo analysis (Nabawy, M., & Khodeir, 2020). However, qualitative risk analysis is an effective method when the study aims to prioritize the order of dealing with risks.…”
Section: Literature Reviewmentioning
confidence: 99%
“…This underlines the importance of sensitivity analysis and the Monte Carlo Method (MCM) as key tools for sustainable risk management. (Fregonara et al, 2019)…”
Section: Activating Environmental and Economic Sustainability In Risk...mentioning
confidence: 99%
“…Taking the Hui village in Dongying Town, Daming County, as the research object, the current situation and problems of Hui architectural style in Daming County through field research and literature review have been sorted out [13]. Combined with relevant examples, the principles of Hui architectural renovation were summarized.…”
Section: Studies On Village Changementioning
confidence: 99%
“…Construction risk usually involves many factors, such as construction workers risk behavior [23], 4M1E [24], and management risk [25]. In terms of construction risk identification [26], analysis [27], evaluation [28], and risk control [29], scholars have carried out abundant research and found that construction risk factors have different dimensions, such as the dimension of participants, the dimension of construction control objectives, the dimension of engineering nature, the dimension of total factors, and the dimension of project management. No matter which dimension, it represents the concrete description of the project construction risk.…”
Section: Status Of Construction Riskmentioning
confidence: 99%