2023
DOI: 10.1177/19375867231166094
|View full text |Cite
|
Sign up to set email alerts
|

A Systematic Literature Review on Healthcare Facility Evaluation Methods

Abstract: To present a systematic literature review on predesign evaluation (PDE), postoccupancy evaluation (POE), and evidence-based design (EBD); to delimit the concepts and relationships of these terms and place them in the building life cycle framework to guide their application and indicate a common understanding and possible gaps. The preferred reporting items for systematic reviews and meta-analyses protocol was used. Inclusion criteria cover texts that present a concept, method, procedure, or tool and use the ex… Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
3

Citation Types

0
0
0

Year Published

2024
2024
2024
2024

Publication Types

Select...
3

Relationship

0
3

Authors

Journals

citations
Cited by 3 publications
(3 citation statements)
references
References 62 publications
0
0
0
Order By: Relevance
“…The purposes of POE include providing a continuous evaluation of a building's social and behavioral aspects, as well as verifying whether the design's intended principles and guidelines were successfully achieved and whether they were adequate (Pereira & Ornstein, 2023). Li et al (2018) mentioned POE methods that encompass both subjective assessments and physical measurements.…”
Section: Post-occupancy and Pre-design Evaluationmentioning
confidence: 99%
See 2 more Smart Citations
“…The purposes of POE include providing a continuous evaluation of a building's social and behavioral aspects, as well as verifying whether the design's intended principles and guidelines were successfully achieved and whether they were adequate (Pereira & Ornstein, 2023). Li et al (2018) mentioned POE methods that encompass both subjective assessments and physical measurements.…”
Section: Post-occupancy and Pre-design Evaluationmentioning
confidence: 99%
“…Hadjri and Crozier (2009) and Joseph et al (2014) agreed that this narrow focus can hinder its effective integration into other research, design, and building procurement processes. Pereira and Ornstein (2023) assert that POE provides insights into the usability of the environment and often includes an evaluation of the building's performance, but it does not inherently present tools for effective intervention in these activities, despite its importance for offering feedback related to facilities and project management. This gap highlights the challenge in translating diagnostic insights and recommendations from POE into actionable changes for facility and project management.…”
Section: Post-occupancy and Pre-design Evaluationmentioning
confidence: 99%
See 1 more Smart Citation