2013
DOI: 10.1016/j.trc.2013.08.010
|View full text |Cite
|
Sign up to set email alerts
|

A survey on planning semi-flexible transit systems: Methodological issues and a unifying framework

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
2
1
1
1

Citation Types

0
43
0

Year Published

2014
2014
2023
2023

Publication Types

Select...
6
1

Relationship

0
7

Authors

Journals

citations
Cited by 94 publications
(50 citation statements)
references
References 24 publications
0
43
0
Order By: Relevance
“…More specifically, the route deviation systems are much more constrained than those allowed for point deviation; they must operate along a well-defined path and deviate to serve curb-to-curb requests within a service area around the path [9]. On the other hand, route deviation systems have a lower administrative/dispatch requirements and are easier to operate than point deviation services.…”
Section: Literature Reviewmentioning
confidence: 99%
See 2 more Smart Citations
“…More specifically, the route deviation systems are much more constrained than those allowed for point deviation; they must operate along a well-defined path and deviate to serve curb-to-curb requests within a service area around the path [9]. On the other hand, route deviation systems have a lower administrative/dispatch requirements and are easier to operate than point deviation services.…”
Section: Literature Reviewmentioning
confidence: 99%
“…For this condition, the expected walking time is equal to the result from (8). The expected waiting of the type I, type II, and flag request type III passengers can be derived by (9).…”
Section: At the Expected Demand Levelmentioning
confidence: 99%
See 1 more Smart Citation
“…The introduction of HT systems has been demonstrated to overcome the shortcomings of pure DRT, such as relatively high operational cost and lack of flexibility in route design with long pre-booking time (Westerlund et al 2000). HT operation types can be classified into six major groups: route deviation, point deviation, demand-responsive connector, request stops, flexible-route segments and zone route (Errico et al 2013). They are depicted in Figure 2.1 and are briefly described as follows:…”
Section: Htmentioning
confidence: 99%
“…A succinte review on taxi and urban demand-responsive system are given in [1,2,4,3,6,5,8] where Multi-agent-based model of simulation has been build for urban dynamic traffic services to addressing the problem of traffic congestion, CO 2 emissions, air pollution, accidents financial costs, and other environmental damages.…”
Section: Sky-car Network -Notion Of Maglev-graphmentioning
confidence: 99%